An Inverse Optimal Value Approach for Synchronously Optimizing Activity Durations and Worker Assignments with a Project Ideal Cost
Lili Zhang (),
Zhengrui Chen,
Dan Shi and
Yanan Zhao
Additional contact information
Lili Zhang: School of Maritime Economics and Management, Dalian Maritime University, Dalian 116026, China
Zhengrui Chen: School of Business, Dalian University of Technology, Panjin 124221, China
Dan Shi: School of Business, Dalian University of Technology, Panjin 124221, China
Yanan Zhao: School of Economics and Management, Liaoning Petrochemical University, Fushun 113001, China
Mathematics, 2023, vol. 11, issue 5, 1-21
Abstract:
Most companies survive the pain of cost and schedule overruns because of inaccurate project activity time settings. In order to deliver a project with a target cost and on schedule, this research proposes an inverse optimal value approach to optimize activity durations and the corresponding worker assignments synchronously to make the optimal project cost infinitely close to an ideal cost. The leader model reflects cost orientation and adjustability of activity durations, the follower model reflects the complexity of activity sequence, critical path completion time, cost pressure, skill matching, energy consumption, and other costs. Through upper-level and lower-level feedback and interaction of activity durations and worker assignments it is possible to deliver a project with an ideal cost. With considerations of the mathematical model characteristics of bi-level programming, nonlinearity, NP hard, and MAX functions, an improved genetic algorithm combining adaptive artificial fish swarms is designed. From the comparison results of random examples and an actual example, the error rate of the optimal value of the improved algorithm is acceptable. Numerical experiments show that the inverse optimal approach can deliver a project without delay and with an ideal cost. The inverse optimization method is more in line with the idea of target management, and can help managers achieve the purpose of cost control.
Keywords: inverse optimal value method; worker assignment; activity duration optimization; target cost; adaptive artificial fish swarm genetic algorithm (search for similar items in EconPapers)
JEL-codes: C (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
https://www.mdpi.com/2227-7390/11/5/1178/pdf (application/pdf)
https://www.mdpi.com/2227-7390/11/5/1178/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jmathe:v:11:y:2023:i:5:p:1178-:d:1082476
Access Statistics for this article
Mathematics is currently edited by Ms. Emma He
More articles in Mathematics from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().