EconPapers    
Economics at your fingertips  
 

Research on the Application of Fuzzy Bayesian Network in Risk Assessment of Catenary Construction

Yongjun Chen, Xiaojian Li, Jin Wang (), Mei Liu, Chaoxun Cai and Yuefeng Shi
Additional contact information
Yongjun Chen: School of Urban Economics and Management, Beijing University of Civil Engineering and Architecture, Beijing 102616, China
Xiaojian Li: School of Urban Economics and Management, Beijing University of Civil Engineering and Architecture, Beijing 102616, China
Jin Wang: School of Civil Engineering, Central South University, Changsha 410075, China
Mei Liu: School of Urban Economics and Management, Beijing University of Civil Engineering and Architecture, Beijing 102616, China
Chaoxun Cai: State Key Laboratory for Track Technology of High-Speed Railway, China Academy of Railway Sciences Corporation Limited, Beijing 100081, China
Yuefeng Shi: State Key Laboratory for Track Technology of High-Speed Railway, China Academy of Railway Sciences Corporation Limited, Beijing 100081, China

Mathematics, 2023, vol. 11, issue 7, 1-19

Abstract: The research on risk control during the construction stage of catenary is relatively limited. Based on a comprehensive analysis of the risk factors during catenary construction, this study determined the causal relationships between the risk factors and established a risk assessment model for catenary construction that analyzed the risks from a causal logic perspective. During the evaluation process, we identified six exogenous variables and twenty-one endogenous variables for risk factors in the construction of catenary based on a literature review in the field of catenary construction and expert opinions, described the cause-and-effect relationships between variables using structural equations and causal diagrams, and established a multi-level catenary construction risks structural causal model. Based on expert fuzzy evaluation and expert experience, the occurrence probability of exogenous variables and the conditional probability of endogenous variables were determined, respectively. Then, the risk assessment model of catenary construction stage based on fuzzy Bayesian Network was constructed to analyze the risk of catenary construction process. The results showed that the personal quality of the construction personnel and the sense of responsibility of the supervision unit had a great impact on the risk level of catenary construction. The findings can help construction personnel fully consider various weak points in catenary construction, thereby ensuring efficient and high-quality catenary construction.

Keywords: catenary; fuzzy number; Bayesian Network; structural causal model; risk assessment (search for similar items in EconPapers)
JEL-codes: C (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
https://www.mdpi.com/2227-7390/11/7/1719/pdf (application/pdf)
https://www.mdpi.com/2227-7390/11/7/1719/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jmathe:v:11:y:2023:i:7:p:1719-:d:1115265

Access Statistics for this article

Mathematics is currently edited by Ms. Emma He

More articles in Mathematics from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jmathe:v:11:y:2023:i:7:p:1719-:d:1115265