Managing Disruptions in a Flow-Shop Manufacturing System
Ajay Surendrarao Bhongade (),
Prakash Manohar Khodke,
Ateekh Ur Rehman (),
Manoj Dattatray Nikam,
Prathamesh Dattatray Patil and
Pramod Suryavanshi
Additional contact information
Ajay Surendrarao Bhongade: Department of Mechanical Engineering, Bharati Vidyapeeth College of Engineering, Navi Mumbai 400708, India
Prakash Manohar Khodke: Department of Mechanical Engineering, Government College of Engineering, Yavatmal 444604, India
Ateekh Ur Rehman: Department of Industrial Engineering, College of Engineering, King Saud University, Riyadh 11451, Saudi Arabia
Manoj Dattatray Nikam: Department of Mechanical Engineering, Bharati Vidyapeeth College of Engineering, Navi Mumbai 400708, India
Prathamesh Dattatray Patil: Department of Mechanical Engineering, Bharati Vidyapeeth College of Engineering, Navi Mumbai 400708, India
Pramod Suryavanshi: Department of Artificial Intelligence, Dublin Business School, D02WC04 Dublin, Ireland
Mathematics, 2023, vol. 11, issue 7, 1-22
Abstract:
There is a manufacturing system where several parts are processed through machining workstations and later assembled to form final products. In the event of disruptions such as machine failure, the original flow-shop schedule needs to be revised and/or rescheduled. In such a scenario, rescheduling methods based on right-shift rescheduling and affected operations rescheduling work very well. Here in this study, the deviation of the make-span of the revised schedule from the original schedule is used as a performance measure. We have proposed three rescheduling methods. There are multiple factors that influence the performance of the rescheduling methodology. One of them is the make-span deviation of the schedule, and the factors influencing it are optimality of the initial solution, failure duration, deviation of make-span, rescheduling method, size, and instant of failure. The initial schedule and problem size depend on the flow-shop manufacturing system for which scheduling is performed, but the method of rescheduling depends on the decision as to which rescheduling methodology is to be selected. Computations are performed using full factorial experimentation. We also observed that right-shift rescheduling is the preferred rescheduling method in the majority of situations. In contrast, the affected operation rescheduling method is also equally suitable when the initial solution is created using modified bottleneck minimum idleness.
Keywords: scheduling; right-shift rescheduling; affected operations rescheduling; genetic algorithm; heuristics (search for similar items in EconPapers)
JEL-codes: C (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/2227-7390/11/7/1731/pdf (application/pdf)
https://www.mdpi.com/2227-7390/11/7/1731/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jmathe:v:11:y:2023:i:7:p:1731-:d:1116144
Access Statistics for this article
Mathematics is currently edited by Ms. Emma He
More articles in Mathematics from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().