Machine Downtime Effect on the Warm-Up Period in an Economic Production Quantity Problem
Erfan Nobil,
Leopoldo Eduardo Cárdenas-Barrón (),
Dagoberto Garza-Núñez,
Gerardo Treviño-Garza,
Armando Céspedes-Mota,
Imelda de Jesús Loera-Hernández,
Neale R. Smith and
Amir Hossein Nobil
Additional contact information
Erfan Nobil: Tecnológico de Monterrey, School of Engineering and Sciences, E. Garza Sada 2501 Sur, Monterrey 64849, Nuevo León, Mexico
Leopoldo Eduardo Cárdenas-Barrón: Tecnológico de Monterrey, School of Engineering and Sciences, E. Garza Sada 2501 Sur, Monterrey 64849, Nuevo León, Mexico
Dagoberto Garza-Núñez: Tecnológico de Monterrey, School of Engineering and Sciences, E. Garza Sada 2501 Sur, Monterrey 64849, Nuevo León, Mexico
Gerardo Treviño-Garza: Tecnológico de Monterrey, School of Engineering and Sciences, E. Garza Sada 2501 Sur, Monterrey 64849, Nuevo León, Mexico
Armando Céspedes-Mota: Tecnológico de Monterrey, School of Engineering and Sciences, E. Garza Sada 2501 Sur, Monterrey 64849, Nuevo León, Mexico
Imelda de Jesús Loera-Hernández: Tecnológico de Monterrey, School of Engineering and Sciences, E. Garza Sada 2501 Sur, Monterrey 64849, Nuevo León, Mexico
Neale R. Smith: Tecnológico de Monterrey, School of Engineering and Sciences, E. Garza Sada 2501 Sur, Monterrey 64849, Nuevo León, Mexico
Amir Hossein Nobil: Tecnológico de Monterrey, School of Engineering and Sciences, E. Garza Sada 2501 Sur, Monterrey 64849, Nuevo León, Mexico
Mathematics, 2023, vol. 11, issue 7, 1-23
Abstract:
Success in the industrial sector is compromised by diverse conditions such as imperfect product production, manufacturing line interruptions, and unscheduled maintenance. The precise use of common practices in production environments is an available solution to eliminate some of these issues. Applying a warm-up period in a manufacturing process is adequate and cost-effective for almost all companies. It improves the equipment’s productivity and helps the manufacturing line generate fewer defective products. Even though several inventory management studies have included a warm-up phase in their models, its use in economic production quantity (EPQ) models remains largely unexplored. Adding a warm-up phase to the production cycle minimizes maintenance expenses and defective products and increases the machine’s performance. In this study, the dependency between the machine downtime and the warm-up length is examined for the first time. The warm-up time depends on the machine’s off-state period: if the machine has a longer operation timeout, then a longer warm-up period is needed. The model includes a function to model the warm-up time relative to the machine downtime and two types of defective products: scrapping and reworking items. The study is concluded with some numerical examples, a sensitivity analysis, and some management insights related to the EPQ.
Keywords: economic quantity problem; warm-up; downtime; defective items; exact solution (search for similar items in EconPapers)
JEL-codes: C (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.mdpi.com/2227-7390/11/7/1740/pdf (application/pdf)
https://www.mdpi.com/2227-7390/11/7/1740/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jmathe:v:11:y:2023:i:7:p:1740-:d:1116463
Access Statistics for this article
Mathematics is currently edited by Ms. Emma He
More articles in Mathematics from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().