Deformation Prediction Model of Existing Tunnel Structures with Equivalent Layered Method–Peck Coupled under Multiple Factors
Yifan Li,
Changfu Huang,
Hongjian Lu () and
Chao Mou ()
Additional contact information
Yifan Li: School of Civil and Environment Engineering, University of Science and Technology Beijing, Beijing 100083, China
Changfu Huang: School of Civil and Environment Engineering, University of Science and Technology Beijing, Beijing 100083, China
Hongjian Lu: College of Mineral Engineering, North China University of Science and Technology, Tangshan 063210, China
Chao Mou: College of Mineral Engineering, North China University of Science and Technology, Tangshan 063210, China
Mathematics, 2024, vol. 12, issue 10, 1-17
Abstract:
The existing tunnel structure, the new underpass tunnel structure and the rock strata in the area of influence of the crossover tunnel are interacting systems that are affected by various factors, such as dynamic and static excavation loads and dynamic and static train loads. The existing theoretical models for the deformation prediction of existing tunnels lack the synergistic analysis of dynamic and static loads on both existing and new tunnels. Based on the theory of the current layer method and Peck’s empirical formula, this paper considers the stiffness of existing tunnels, the stiffness of new tunnels, the loads of excavation methods and the loads of existing tunnels. The results show that a theoretical model for the prediction of the deformation of double-lane highway tunnels underneath existing railroad tunnels with the coupling of the current layer method and Peck under multiple factors is constructed; a modified Peck settlement formula for the base plate of the existing tunnels is put forward; and, through numerical calculations and monitoring data for validation and optimization, it is proved that the theoretical model is applicable to the excavation of tunnels underneath mountainous areas mined by the blasting method.
Keywords: deformation prediction model; multiple factors; equivalent layered method; Peck; underpass tunnel; existing tunnel (search for similar items in EconPapers)
JEL-codes: C (search for similar items in EconPapers)
Date: 2024
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/2227-7390/12/10/1479/pdf (application/pdf)
https://www.mdpi.com/2227-7390/12/10/1479/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jmathe:v:12:y:2024:i:10:p:1479-:d:1391459
Access Statistics for this article
Mathematics is currently edited by Ms. Emma He
More articles in Mathematics from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().