Construction Waste Transportation Planning under Uncertainty: Mathematical Models and Numerical Experiments
Wen Yi,
Ying Terk Lim,
Huiwen Wang (),
Lu Zhen and
Xin Zhou
Additional contact information
Wen Yi: Department of Building and Real Estate, Faculty of Construction and Environment, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong 999077, China
Ying Terk Lim: Department of Building and Real Estate, Faculty of Construction and Environment, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong 999077, China
Huiwen Wang: Department of Building and Real Estate, Faculty of Construction and Environment, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong 999077, China
Lu Zhen: School of Management, Shanghai University, Shanghai 200444, China
Xin Zhou: Department of Building and Real Estate, Faculty of Construction and Environment, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong 999077, China
Mathematics, 2024, vol. 12, issue 19, 1-17
Abstract:
Annually, over 10 billion tons of construction and demolition waste is transported globally from sites to reception facilities. Optimal and effective planning of waste transportation holds the potential to mitigate cost and carbon emissions, and alleviate road congestion. A major challenge for developing an effective transportation plan is the uncertainty of the precise volume of waste at each site during the planning stage. However, the existing studies have assumed known demand in planning models but the assumption does not reflect real-world volatility. Taking advantage of the problem structure, this study adopts the stochastic programming methodology to approach the construction waste planning problem. An integer programming model is developed that adeptly addresses the uncertainty of the amount of waste in an elegant manner. The proposed stochastic programming model can efficiently handle practical scale problems. Our numerical experiments amass a comprehensive dataset comprising nearly 4300 records of the actual amount of construction waste generated in Hong Kong. The results demonstrate that incorporating demand uncertainty can reduce the transportation cost by 1% correlating with an increase in profit of 14% compared to those that do not consider the demand uncertainty.
Keywords: construction waste transportation; demand uncertainty; stochastic programming (search for similar items in EconPapers)
JEL-codes: C (search for similar items in EconPapers)
Date: 2024
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/2227-7390/12/19/3018/pdf (application/pdf)
https://www.mdpi.com/2227-7390/12/19/3018/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jmathe:v:12:y:2024:i:19:p:3018-:d:1487410
Access Statistics for this article
Mathematics is currently edited by Ms. Emma He
More articles in Mathematics from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().