A Comprehensive Fuzzy Decision-Making Method for Minimizing Completion Time in Manufacturing Process in Supply Chains
Fahad Kh. A.O.H. Alazemi,
Mohd Khairol Anuar Bin Mohd Ariffin,
Faizal Bin Mustapha and
Eris Elianddy bin Supeni
Additional contact information
Fahad Kh. A.O.H. Alazemi: Department of Mechanical and Manufacturing Engineering, Universiti Putra Malaysia, Serdang 43400, Malaysia
Mohd Khairol Anuar Bin Mohd Ariffin: Department of Mechanical and Manufacturing Engineering, Universiti Putra Malaysia, Serdang 43400, Malaysia
Faizal Bin Mustapha: Department of Mechanical and Manufacturing Engineering, Universiti Putra Malaysia, Serdang 43400, Malaysia
Eris Elianddy bin Supeni: Department of Mechanical and Manufacturing Engineering, Universiti Putra Malaysia, Serdang 43400, Malaysia
Mathematics, 2021, vol. 9, issue 22, 1-39
Abstract:
In manufacturing firms, there are many factors that can affect product completion time in production lines. However, in a real production environment, such factors are uncertain and increase the adverse effects on product completion time. This research focuses on the role of internal factors in small- and medium-scale supply chains in developing countries, enhancing product completion time during the manufacturing process in fuzzy conditions. In the first step of this research, a list of factors was found clustered into six main groups: technology, human resources, machinery, material, facility design, and social factors. In the next step, fuzzy weights of each group factor were determined by a fuzzy inference system to reflect the uncertainty of the factors in utilizing product completion time. Then, a hybrid fuzzy–TOPSIS-based heuristic is proposed to generate and select the best production alternative. The outcomes showed that the proposed method could generate and select the alternative with a 10.13% lower product completion time. The findings also indicated that using the proposed fuzzy method will cause less minimum variance compared to the crisp mode.
Keywords: supply chain management; uncertainty; hybrid fuzzy–TOPSIS heuristic; product completion time (search for similar items in EconPapers)
JEL-codes: C (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.mdpi.com/2227-7390/9/22/2919/pdf (application/pdf)
https://www.mdpi.com/2227-7390/9/22/2919/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jmathe:v:9:y:2021:i:22:p:2919-:d:680635
Access Statistics for this article
Mathematics is currently edited by Ms. Emma He
More articles in Mathematics from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().