Methodology for Economic Analysis of Highly Uncertain Innovative Projects of Improbability Type
Aleksandr Babkin,
Nadezhda Kvasha,
Daniil Demidenko,
Ekaterina Malevskaia-Malevich () and
Evgeny Voroshin
Additional contact information
Aleksandr Babkin: Higher School of Economics and Engineering, Institute of Industrial Management, Economics and Trade, Peter the Great St. Petersburg Polytechnic University, Saint Petersburg 195251, Russia
Nadezhda Kvasha: Department of Economics and Management of Infocommunications, The Bonch-Bruevich Saint Petersburg State University of Telecommunications, Saint Petersburg 193232, Russia
Daniil Demidenko: Higher School of Economics and Engineering, Institute of Industrial Management, Economics and Trade, Peter the Great St. Petersburg Polytechnic University, Saint Petersburg 195251, Russia
Ekaterina Malevskaia-Malevich: Department of Management, The North-West Institute of Management-Branch of the Russian Presidential Academy of National Economy and Public Administration (RANEPA), Saint Petersburg 199034, Russia
Evgeny Voroshin: Department of High-Tech Production Economics, St. Petersburg State University of Aerospace Instrumentation, Saint Petersburg 190000, Russia
Risks, 2022, vol. 11, issue 1, 1-20
Abstract:
Modern conditions for real investment are generally associated with increasing uncertainty, which is even more relevant when evaluating innovative projects. Current innovation analysis methods using a linear model are outdated. At the same time, an open interactive model of the innovation process, formed due to digitalization, allows to connect to innovations at almost any stage of their life cycle. The aim of the study is to form a methodology for the economic analysis of innovative projects implemented in the context of an open innovation model. To achieve the goal, the study defines approaches to innovation projects differentiation. The approach to the analysis methods selection is based on the decision matrix. The developed decision matrix allows to determine the location of each project as its element and to select analysis methods, considering the project’s uncertainty characteristics. The logic of the analysis methods transformation under the influence of a changing uncertainty level determines the combination of the fuzzy-set approach and the concept of real options. The implementation of the project analysis algorithm leads to the choice of an appropriate method for evaluating effectiveness and ensures that the flexible risk response concept under conditions of improbable uncertainty is taken into account when implementing the option model.
Keywords: innovative projects; investment analysis; risk and uncertainty of improbability type; real options; fuzzy-set approach; open interactive process innovation model (search for similar items in EconPapers)
JEL-codes: C G0 G1 G2 G3 K2 M2 M4 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/2227-9091/11/1/3/pdf (application/pdf)
https://www.mdpi.com/2227-9091/11/1/3/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jrisks:v:11:y:2022:i:1:p:3-:d:1009213
Access Statistics for this article
Risks is currently edited by Mr. Claude Zhang
More articles in Risks from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().