EconPapers    
Economics at your fingertips  
 

Learning to Dispatch Operations with Intentional Delay for Re-Entrant Multiple-Chip Product Assembly Lines

Jaeseok Huh, Inbeom Park, Seongmin Lim, Bohyung Paeng, Jonghun Park and Kwanho Kim
Additional contact information
Jaeseok Huh: Department of Industrial Engineering and Institute for Industrial Systems Innovation, Seoul National University, 1 Gwanak-ro, Gwanak-gu, Seoul 151-744, Korea
Inbeom Park: Department of Industrial Engineering and Institute for Industrial Systems Innovation, Seoul National University, 1 Gwanak-ro, Gwanak-gu, Seoul 151-744, Korea
Seongmin Lim: Department of Industrial Engineering and Institute for Industrial Systems Innovation, Seoul National University, 1 Gwanak-ro, Gwanak-gu, Seoul 151-744, Korea
Bohyung Paeng: Department of Industrial Engineering and Institute for Industrial Systems Innovation, Seoul National University, 1 Gwanak-ro, Gwanak-gu, Seoul 151-744, Korea
Jonghun Park: Department of Industrial Engineering and Institute for Industrial Systems Innovation, Seoul National University, 1 Gwanak-ro, Gwanak-gu, Seoul 151-744, Korea
Kwanho Kim: Department of Industrial and Management Engineering, Incheon National University, 119 Academy-ro, Yeonsu-gu, Incheon 407-772, Korea

Sustainability, 2018, vol. 10, issue 11, 1-21

Abstract: As the demand for small devices with embedded flash memory increases, semiconductor manufacturers have been recently focusing on producing high-capacity multiple-chip products (MCPs). Due to the frequently re-entrant lots between the die attach (DA) and wire bonding (WB) assembly stages in MCP production, increased flow time and decreased resource utilization are unavoidable. In this paper, we propose a dispatcher based on artificial neural networks, which minimizes the flow time while maintaining high utilization of resources at the same time through exploiting the possible intentional delays on DA stage. Specifically, the proposed dispatcher learns the assignment preferences between available lots and DA resources based on assembly line data generated by using a simulator, then the proposed dispatcher performs lot dispatching decisions by considering the intentional delays. The numerical experiments were performed under various configurations of the MCP assembly lines, and the results show that the proposed dispatcher outperformed the existing methods.

Keywords: lot dispatching; semiconductor; assembly line; multiple-chip product; intentional delay; artificial neural network; sustainability (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2018
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/2071-1050/10/11/4123/pdf (application/pdf)
https://www.mdpi.com/2071-1050/10/11/4123/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:10:y:2018:i:11:p:4123-:d:181797

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:10:y:2018:i:11:p:4123-:d:181797