Analysis of Best Practices to Prevent and Manage the Waste Generated in Building Rehabilitation Works

Paola Villoria Sáez, Mercedes Del Río Merino, César Porras-Amores, Jaime Santa Cruz Astorqui and Natalia González Pericot
Additional contact information
Paola Villoria Sáez: TEMA Research group, Departamento de Construcciones Arquitectónicas y su Control, Escuela Técnica Superior de Edificación, Universidad Politécnica de Madrid, Avenida Juan de herrera, 6, 28040 Madrid, Spain
Mercedes Del Río Merino: TEMA Research group, Departamento de Construcciones Arquitectónicas y su Control, Escuela Técnica Superior de Edificación, Universidad Politécnica de Madrid, Avenida Juan de herrera, 6, 28040 Madrid, Spain
César Porras-Amores: TEMA Research group, Departamento de Construcciones Arquitectónicas y su Control, Escuela Técnica Superior de Edificación, Universidad Politécnica de Madrid, Avenida Juan de herrera, 6, 28040 Madrid, Spain
Jaime Santa Cruz Astorqui: TEMA Research group, Departamento de Tecnología de Edificación, Escuela Técnica Superior de Edificación, Universidad Politécnica de Madrid, Avenida Juan de herrera, 6, 28040 Madrid, Spain
Natalia González Pericot: Departamento de Arquitectura, Diseño y Construcciones Civiles, Escuela de Arquitectura, Ingeniería y Diseño, Universidad Europea de Madrid, 28670 Villaviciosa de Odón, Madrid, Spain

Sustainability, 2019, vol. 11, issue 10, 1-14

Abstract: This paper carries out a survey conducted among the construction agents in order to evaluate the effectiveness and viability of several best practice measures regarding construction and demolition waste (CDW) management in building rehabilitation works. This survey was developed considering that in rehabilitation works two well differentiated activities are carried out: those of the dismantling of the building (deconstruction activities) and those of the execution of the new construction (construction activities). Results of this survey show that among the highly rated best practices for the design phase “designing the building in order to help the recovery of the materials at the end of its use” can be highlighted, despite less than 25% of respondents usually implement this measure in their works. Moreover, according to BP during the construction phase, the results reveal that only 70% of respondents routinely implement the most valued measure “Hiring authorized companies for the management of CDW” and 60% the second “Respecting the manufacturer’s directions regarding the transport, collection and commissioning”.

Keywords: Construction waste; waste management under construction; best practices; assessment; rehabilitation works; construction survey (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2019
References: View complete reference list from CitEc
Citations: View citations in EconPapers (6)

Downloads: (external link)
https://www.mdpi.com/2071-1050/11/10/2796/pdf (application/pdf)
https://www.mdpi.com/2071-1050/11/10/2796/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:11:y:2019:i:10:p:2796-:d:231584

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:11:y:2019:i:10:p:2796-:d:231584