A Novel Method of Developing Construction Projects Schedule under Rework Scenarios
Guofeng Ma,
Shan Jiang,
Tiancheng Zhu and
Jianyao Jia
Additional contact information
Guofeng Ma: Department of Construction Management and Real Estate, TongJi University, Shanghai 200092, China
Shan Jiang: Department of Construction Management and Real Estate, TongJi University, Shanghai 200092, China
Tiancheng Zhu: Department of Construction Management and Real Estate, TongJi University, Shanghai 200092, China
Jianyao Jia: Department of Construction Management and Real Estate, TongJi University, Shanghai 200092, China
Sustainability, 2019, vol. 11, issue 20, 1-25
Abstract:
Construction projects have faced serious schedule delays caused by rework risks. However, it appears that traditional methods are of limited value in developing applicable project schedules. This study presents an analysis on construction projects schedule development under rework scenarios by a novel method named the improved critical chain design structure matrix (CCDSM). Research data are collected from a real estate development project in China. As a result, predictions of project completion duration and probability have been made. A reliable schedule considering information interactions has been developed and visualized. Rework impact areas of activities have been examined to quantitatively record the impact on project duration. To meet different demands, the method generates two more schedules setting different rework buffers. Furthermore, these activities have the potential of causing rework and have been quantified based on the calculation of two criticalities, providing an identification of rework-intensive works that should be payed close importance to, which have not be realized by previous methods. The results proved the feasibility and effectiveness of this method in developing a schedule for construction projects disturbed by rework, helping practitioners adopt measures to avoid rework-caused schedule delays and achieve sustainable development of such projects.
Keywords: schedule management; rework; critical chain design structure matrix; construction projects (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/2071-1050/11/20/5710/pdf (application/pdf)
https://www.mdpi.com/2071-1050/11/20/5710/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:11:y:2019:i:20:p:5710-:d:276948
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().