EconPapers    
Economics at your fingertips  
 

An Empirical Study on the Acceptance of 4D BIM in EPC Projects in China

Pan Gong, Ningshuang Zeng, Kunhui Ye and Markus König
Additional contact information
Pan Gong: School of Construction Management and Real Estate, Chongqing University, Chongqing 400045, China
Ningshuang Zeng: Faculty of Civil and Environmental Engineering, Ruhr-Universität Bochum, Universitätsstraße 150, D-44780 Bochum, Germany
Kunhui Ye: School of Construction Management and Real Estate, Chongqing University, Chongqing 400045, China
Markus König: Faculty of Civil and Environmental Engineering, Ruhr-Universität Bochum, Universitätsstraße 150, D-44780 Bochum, Germany

Sustainability, 2019, vol. 11, issue 5, 1-19

Abstract: The engineering-procurement-construction (EPC) method has the potential to help construction projects achieve sustainable performance, e.g., the contractor’s early involvement, cost savings, and a reduced schedule. However, high uncertainties and complexities are contained in EPC projects. 4D BIM (Building Information Modeling) with abilities to simplify the time and space relationships of construction activities and support multi-party information sharing is beneficial to EPC project management. The behavior pattern of the project personnel toward accepting 4D BIM information systems or tools needs to be explored. Therefore, a research model of the acceptance of 4D BIM in EPC projects with eight latent constructs is proposed through a literature review of technology acceptance theories. Data is collected from a questionnaire survey and interviews. Research hypotheses are examined using PLS-SEM (partial least squares-structural equation modeling). Empirical evidence is collected from China, and implications to the developing countries facing the challenge of developing a technology-intensive construction industry are provided: (1) Adopting 4D BIM in the EPC project is beneficial; (2) the task-technology fit plays a leading role in technology acceptance; (3) the management incentive is inefficient at the operational stage. Suggestions for future research on 4D BIM acceptance in complex construction projects with abundant data and alternative models are provided.

Keywords: engineer-procurement-construct; 4D BIM; technology acceptance; PLS-SEM (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
https://www.mdpi.com/2071-1050/11/5/1316/pdf (application/pdf)
https://www.mdpi.com/2071-1050/11/5/1316/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:11:y:2019:i:5:p:1316-:d:210431

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:11:y:2019:i:5:p:1316-:d:210431