Root Cause Analysis in Post Project Phases as Application of Knowledge Management

Radek Doskočil and Branislav Lacko
Additional contact information
Radek Doskočil: Department of Informatics, Faculty of Business and Management, Brno University of Technology, Kolejní 2906/4, 612 00 Brno, Czech Republic
Branislav Lacko: Institute of Automation and Computer Science, Faculty of Mechanical Engineering, Brno University of Technology, Technická 2896/2, 616 69 Brno, Czech Republic, lacko@fme.vutbr.cz

Sustainability, 2019, vol. 11, issue 6, 1-15

Abstract: This paper is focused on the root cause analysis of post project phases. The research has been linked to the identification of the 21 most common reasons for not executing post project phases. The main aim of this paper is to identify the root causes of not executing selected post project phases. The empirical research was performed as qualitative research employing the observation and inquiry methods in the form of a controlled semi-structured interview. The research was realised in the Czech Republic in 2017 and 2018. The key performances for ensuring a functional, effective and systematic post project process are based on the principles of knowledge management. The identified causes were used as inputs for the proposed measures with the aim to make the post project process more effective. The main contribution of the paper is the overview of techniques that may be recommended for post project analysis. These techniques are demonstrated in detail on particular examples of the analysis of the most common reasons for failure to implement post project phases. The described examples demonstrate the procedure to be followed in order to identify the root cause of the analysed phenomenon. At the same time, the paper also describes proposals of recommended measures that should minimize the root causes resulting in negative outcomes. The paper explicitly emphasizes and shows the connection between knowledge management and post project phase effectiveness.

Keywords: project management; knowledge management; post project phases; root cause analysis; complex project management; Pareto analysis; 5 Whys method; Ishikawa diagram; Tree diagram (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
https://www.mdpi.com/2071-1050/11/6/1667/pdf (application/pdf)
https://www.mdpi.com/2071-1050/11/6/1667/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:11:y:2019:i:6:p:1667-:d:215414

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:11:y:2019:i:6:p:1667-:d:215414