Multidimensional Construction Planning and Agile Organized Project Execution—The 5D-PROMPT Method
David Leicht,
Daniel Castro-Fresno,
Joaquìn Dìaz and
Christian Baier
Additional contact information
David Leicht: GITECO Research Group, University of Cantabria, 39005 Santander, Spain
Daniel Castro-Fresno: GITECO Research Group, University of Cantabria, 39005 Santander, Spain
Joaquìn Dìaz: Department of Information Technology in Construction, University of Applied Sciences, 35390 THM Giessen, Germany
Christian Baier: Department of Information Technology in Construction, University of Applied Sciences, 35390 THM Giessen, Germany
Sustainability, 2020, vol. 12, issue 16, 1-22
Abstract:
Although tremendous technological and strategic advances have been developed and implemented in the construction sector in recent years, there is substantial room for improvement in the areas of productivity growth, project performance, and schedule reliability. Thus, the present paper seeks to discover why the currently applied scheduling tools and the latest agile-based project organization approaches have not yet achieved their full potential. A missing interlinkage between the project’s design, cost, and time aspects within the project design phase and its sparse utilization throughout project execution were indicated as the driving contributors responsible for the slow progress in development. To fundamentally change this situation, an extensive and coherent project organization solution is proposed. The key process of this solution utilizes a 5D Building Information Model comprising tight concatenations between the individual model objects and the corresponding construction cost and time effort values. The key dates of a waterfall-based construction process simulation, set during the project planning phase, provide particular information to create a structure for agile organized project execution. The implementation of information feedback loops allows target/actual comparisons and contributes to continual improvements in future planning. A comparative case study was conducted with auspicious results on improvements in the overall project performance, and schedule and cost reliability.
Keywords: 5D building information modeling; agile project organization; schedule/cost reliability (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2020
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
https://www.mdpi.com/2071-1050/12/16/6340/pdf (application/pdf)
https://www.mdpi.com/2071-1050/12/16/6340/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:12:y:2020:i:16:p:6340-:d:395515
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().