Preparing for Successful Collaborative Contracts

Ole Jonny Klakegg, Julien Pollack and Lynn Crawford
Additional contact information
Ole Jonny Klakegg: Department of Civil and Environmental Engineering, Norwegian University of Science and Technology, 7491 Trondheim, Norway
Julien Pollack: School of Civil Engineering, The University of Sydney, Darlington, NSW 2006, Australia
Lynn Crawford: School of Civil Engineering, The University of Sydney, Darlington, NSW 2006, Australia

Sustainability, 2020, vol. 13, issue 1, 1-18

Abstract: Preparing well before entering a contract is always vital, independent of the characteristics of the project and type of contract. However, as projects become larger and more complex, and value for stakeholders and society becomes the dominating perspective on success, the need for well-developed collaboration is becoming more and more critical. In this paper, we investigate how the parties should prepare for a collaborative project. The purpose is to help owners secure the success of the project for its key stakeholders. We choose to address the issues as an active risk mitigation strategy that serves as a vehicle to reduce uncertainty, avoid unnecessary risks, and utilize opportunities as a project owner. We look at the project mainly through a project owner perspective, but on key points, we contrast this with contractor perspectives. The research was performed in Australia in 2020 and includes public and private sector investment projects. The methodology is qualitative case studies and includes primarily in-depth interviews supplemented with document studies and two workshop group discussions. The paper highlights the difference between being collaborative in a contract and using a collaborative contract. The results document significant differences in preparations depending on the degree of complexity of the projects. One major difference is illustrated in the different levels of precision in terms and definitions used in communication. Complex projects require freedom of interpretation only gained by allowing wide and less precise expressions.

Keywords: construction; complexity; collaboration; contract; project delivery method; risk mitigation strategy; risk allocation; successful project delivery; stakeholder value (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2020
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/2071-1050/13/1/289/pdf (application/pdf)
https://www.mdpi.com/2071-1050/13/1/289/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:13:y:2020:i:1:p:289-:d:472586

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:13:y:2020:i:1:p:289-:d:472586