Information Modelling Management and Green Public Procurement for Waste Management and Environmental Renovation of Brownfields
Laura Pellegrini,
Mirko Locatelli,
Silvia Meschini,
Giulia Pattini,
Elena Seghezzi,
Lavinia Chiara Tagliabue and
Giuseppe Martino Di Giuda
Additional contact information
Laura Pellegrini: Department of Architecture, Built Environment and Construction Engineering, Politecnico di Milano, 20133 Milano, Italy
Mirko Locatelli: Department of Architecture, Built Environment and Construction Engineering, Politecnico di Milano, 20133 Milano, Italy
Silvia Meschini: Department of Architecture, Built Environment and Construction Engineering, Politecnico di Milano, 20133 Milano, Italy
Giulia Pattini: Department of Architecture, Built Environment and Construction Engineering, Politecnico di Milano, 20133 Milano, Italy
Elena Seghezzi: Department of Architecture, Built Environment and Construction Engineering, Politecnico di Milano, 20133 Milano, Italy
Lavinia Chiara Tagliabue: Department of Computer Science, University of Turin, 10149 Turin, Italy
Giuseppe Martino Di Giuda: Department of Management, University of Turin, 10134 Turin, Italy
Sustainability, 2021, vol. 13, issue 15, 1-31
Abstract:
Information Modelling and Management (IMM) methods for Most Economically Advantageous Tender (MEAT) can promote the adoption of environmentally sustainable practices. Despite the wide regulatory framework and existing drivers, Construction and Demolition Waste (CDW) trends are still growing. The literature review analyzed IMM and CDW management implementation during design phases although few studies focused on Green Public Procurement (GPP) and CDW management integration from the Public Client’s point of view. This research aims at investigating the integration and efficiency of MEAT and IMM to promote the application of sustainable strategies focused on waste reduction and resource valorization. The study investigates the Public Client’s role in promoting sustainable practices, introducing digital material inventory and BIM during the design phases, and including environmental award criteria in the call for tender documents. A Design Build (DB) procurement model was considered in the case study of a brownfield renovation and the construction of a new school in northern Italy. The methodology provided the Public Client and included a method to evaluate the environmental impact of the bids, allowing for proper selective demolition planning, CDW decrease, and organization while promoting their integration in companies’ expertise and procedures. The replicability of the methodology is demonstrated by positive results of present and previous case studies.
Keywords: building information modelling (BIM); construction and demolition waste (CDW); design build (DB); environmental assessment; public client; waste minimization (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/2071-1050/13/15/8585/pdf (application/pdf)
https://www.mdpi.com/2071-1050/13/15/8585/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:13:y:2021:i:15:p:8585-:d:606555
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().