EconPapers    
Economics at your fingertips  
 

Analysis of the Repair Time of Finishing Works Using a Probabilistic Approach for Efficient Residential Buildings Maintenance Strategies

Youngduk Cho, Sanghyo Lee, Joosung Lee and Jaejun Kim
Additional contact information
Youngduk Cho: Department of Architectural Engineering, Hanyang University, 222, Wangsipri-ro, Sungdong-gu, Seoul 04763, Korea
Sanghyo Lee: Division of Smart Convergence Engineering, Hanyang University ERICA, 55, Hanyangdaehak-ro, Sangnok-gu, Ansan-si 15588, Gyeonggi-do, Korea
Joosung Lee: Division of Architecture and Civil Engineering, Kangwon National University, 346, Jungang-ro, Samcheok-si 25913, Gangwon-do, Korea
Jaejun Kim: Department of Architectural Engineering, Hanyang University, 222, Wangsipri-ro, Sungdong-gu, Seoul 04763, Korea

Sustainability, 2021, vol. 13, issue 22, 1-17

Abstract: In general, the long-term maintenance planning of residential buildings is performed based on uniform repair times. However, in fact, various factors, such as the quality and user patterns, affect the performance of residential building components in the Operation and Maintenance (O&M) phase. Hence, various residential building components are repaired at uncertain times, acting as a risk for the residential building maintenance plan. Therefore, an efficient maintenance plan should be established considering maintenance uncertainty. In this regard, this study aims to analyze the uncertainty of repair times for various finishing works in residential buildings based on a probabilistic methodology and outline the implications for the establishment of efficient maintenance strategies in these buildings. Hence, 47,344 repair data for 63 buildings in 12 public residential building complexes completed between 1991 and 2001 in the Republic of Korea were used for analysis. Before the analysis, a repair time matrix was constructed by classifying the finishing works in 25 types and setting service life times to 6–26 years. The repair time distribution for each finishing work was then derived. Results confirmed that basic repair time setting can be performed and various information for reasonable maintenance decision making regarding each finishing work can be provided through a probabilistic approach. The probabilistic approach can be used as a critical decision-making method because there is uncertainty associated with the repair time of each finishing work owing to the performance degradations of various finishing works due to complex causes. Although this study focused on repair time owing to data collection limitations, maintenance strategies with strategic flexibility can be established by developing probabilistic methods that simultaneously consider frequency and cost by securing additional high-quality cost data.

Keywords: residential building; finishing work; repair time distribution; maintenance strategy; Monte-Carlo simulation; uncertainty (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/2071-1050/13/22/12443/pdf (application/pdf)
https://www.mdpi.com/2071-1050/13/22/12443/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:13:y:2021:i:22:p:12443-:d:676584

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:13:y:2021:i:22:p:12443-:d:676584