Contractor’s Risk Analysis of Engineering Procurement and Construction (EPC) Contracts Using Ontological Semantic Model and Bi-Long Short-Term Memory (LSTM) Technology
So-Won Choi and
Eul-Bum Lee
Additional contact information
So-Won Choi: Graduate Institute of Ferrous and Energy Materials Technology, Pohang University of Science and Technology (POSTECH), Pohang 37673, Korea
Eul-Bum Lee: Graduate Institute of Ferrous and Energy Materials Technology, Pohang University of Science and Technology (POSTECH), Pohang 37673, Korea
Sustainability, 2022, vol. 14, issue 11, 1-32
Abstract:
The development of intelligent information technology in the era of the fourth industrial revolution requires the EPC (engineering, procurement, and construction) industry to increase productivity through a digital transformation. This study aims to automatically analyze the critical risk clauses in the invitation to bid (ITB) at the bidding stage to strengthen their competitiveness for the EPC contractors. To this end, we developed an automated analysis technology that effectively analyzes a large amount of ITB documents in a short time by applying natural language processing (NLP) and bi-directional long short-term memory (bi-LSTM) algorithms. This study proposes two models. First, the semantic analysis (SA) model is a rule-based approach that applies NLP to extract key risk clauses. Second, the risk level ranking (RLR) model is a train-based approach that ranks the risk impact for each clause by applying bi-LSTM. After developing and training an artificial intelligent (AI)-based ITB analysis model, its performance was evaluated through the actual project data. As a result of validation, the SA model showed an F1 score of 86.4 percent, and the RLR model showed an accuracy of 46.8 percent. The RLR model displayed relatively low performance because the ITB used in the evaluation test included the contract clauses that did not exist in the training dataset. Therefore, this study illustrated that the rule-based approach performed superior to the training-based method. The authors suggest that EPC contractors should apply both the SA and RLR modes in the ITB analysis, as one supplements the other. The two models were embedded in the Engineering Machine-learning Automation Platform (EMAP), a cloud-based platform developed by the authors. Rapid analysis through applying both the rule-based and AI-based automatic ITB analysis technology can contribute to securing timeliness for risk response and supplement possible human mistakes in the bidding stage.
Keywords: AI; EPC contract risk extraction; NLP; ontological semantic model; EPC contract lexicon; deontic logic; bi-LSTM; risk level ranking; digital transformation (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.mdpi.com/2071-1050/14/11/6938/pdf (application/pdf)
https://www.mdpi.com/2071-1050/14/11/6938/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:14:y:2022:i:11:p:6938-:d:832751
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().