EconPapers    
Economics at your fingertips  
 

Failure Mechanism and Stability Control Technology of Slope during Open-Pit Combing Underground Extraction: A Case Study from Shanxi Province of China

Shuaihang Shi, Zizheng Guo, Peng Ding, Yabin Tao, Hui Mao and Zhichao Jiao
Additional contact information
Shuaihang Shi: China Aviation Supplies Holding Company, Beijing 101312, China
Zizheng Guo: School of Civil and Transportation Engineering, Hebei University of Technology, Tianjin 300401, China
Peng Ding: China Construction Science & Technology Group Co., Ltd., Beijing 100195, China
Yabin Tao: School of Energy and Mining Engineering, China University of Mining and Technology (Beijing), Beijing 100083, China
Hui Mao: Zhengzhou Road & Bridge Construction Investment Group Co., Ltd., Zhengzhou 450052, China
Zhichao Jiao: Beijing Hongchuang Tianye Construction Engineering Co., Ltd., Beijing 101300, China

Sustainability, 2022, vol. 14, issue 14, 1-21

Abstract: With the development of society, the demand for mineral resources is gradually increasing, and the current situation of decreasing total resources dictates the inevitable interaction between open-pit combing underground extraction (OPUG) in time and space. In this research, we took the Anjialing coal mine in Shanxi Province of China as a case study, and tested the physical and mechanical properties of coal rocks in the laboratory. The similarity criterion was used to build a similar experimental model for the deformation evolution of the slope of the open-pit mine section; the digital scattering method was used to test the influence of the underground mining process parameters on the deformation evolution of the open-pit slope. The results showed that there was an obvious distribution of “three zones” above the mining goaf, namely, a collapse zone, fracture zone, and slow subsidence zone. When the mining face was continuously advanced towards the bottom of the open pit, the supporting stress of the mining face transferred to the side of the open-pit slope. Additionally, large displacement and stress concentration were observed on the slope near the stoping line, which caused the slope body to move along the uppermost part of the slope first, and thereafter along the lower part. Various techniques for slope stability control are discussed, including the optimization of spatial and temporal relationships between open-pit and underground mining, the optimization of mining plans, and the use of monitoring and early warning systems. The results can provide a guide for slope stability control of similar open-pit mines in the process of mining coal resources.

Keywords: open-pit combing underground extraction (OPUG); coal resources mining; model test; slope stability; failure mechanism; control technology (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/2071-1050/14/14/8939/pdf (application/pdf)
https://www.mdpi.com/2071-1050/14/14/8939/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:14:y:2022:i:14:p:8939-:d:868035

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:14:y:2022:i:14:p:8939-:d:868035