EconPapers    
Economics at your fingertips  
 

Avoiding Buffer Tank Overflow in an Iron Ore Dewatering System with Integrated Control System

Ênio L. Junior, Moisés T. da Silva and Thiago A. M. Euzébio
Additional contact information
Ênio L. Junior: Programa de Pós-Graduação em Instrumentação, Controle e Automação de Processos de Mineração, Universidade Federal de Ouro Preto e Instituto Tecnológico Vale, Ouro Preto 35400-000, MG, Brazil
Moisés T. da Silva: Instituto Tecnológico Vale (ITV), Ouro Preto 35400-000, MG, Brazil
Thiago A. M. Euzébio: Instituto Tecnológico Vale (ITV), Ouro Preto 35400-000, MG, Brazil

Sustainability, 2022, vol. 14, issue 15, 1-17

Abstract: High water usage is necessary while ore passes through the many stages of a mineral processing plant. However, a dewatering system filters the final ore pulp product to remove the water, which is reutilized in the previous processes. This step is fundamental to reducing the fresh new water consumption. Usually, several tanks, pumps, and filters form a dewatering system—any failure or shutdowns from those components disbalance the pulp flow. The waste of many tons of water and ore products for a tailing dam is the worst consequence of a mass disbalance in a dewatering system. This paper proposes an advanced regulatory control strategy composed of cascade and override loops for a dewatering system. The main purpose is to increase the production period, even under filter failure and changes in the inlet pulp characteristics. This control strategy is evaluated using a digital model of a large-scale Brazilian iron ore processing plant. Two scenarios are investigated: the simultaneous failure of two filters and disturbances in the flow and density of the thickener. The simulation results show that the proposed control strategy could extend the period of operation of the dewatering plant under failures in the disc filters and reject significant disturbances. For the considered simulation period, the proposed solution increases the time to overflow by 72 % when compared to the previous control strategy. Thus, it is possible to avoid the waste of approximately 2448.36 tons of ore pulp that would be sent to the tailings dam.

Keywords: advanced regulatory control; dewatering process; zero waste (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/2071-1050/14/15/9347/pdf (application/pdf)
https://www.mdpi.com/2071-1050/14/15/9347/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:14:y:2022:i:15:p:9347-:d:876148

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:14:y:2022:i:15:p:9347-:d:876148