Multi-Objective Optimization of Back-to-Back Starting for Pumped Storage Plants under Low Water Head Conditions Based on the Refined Model
Chen Feng,
Guilin Li (),
Yuan Zheng,
Daqing Zhou and
Zijun Mai
Additional contact information
Chen Feng: College of Energy and Electrical Engineering, Hohai University, Nanjing 211100, China
Guilin Li: College of Energy and Electrical Engineering, Hohai University, Nanjing 211100, China
Yuan Zheng: College of Energy and Electrical Engineering, Hohai University, Nanjing 211100, China
Daqing Zhou: College of Energy and Electrical Engineering, Hohai University, Nanjing 211100, China
Zijun Mai: Department of Rural Water Management, Nanjing Hydraulic Research Institute, Nanjing 210029, China
Sustainability, 2022, vol. 14, issue 16, 1-30
Abstract:
Pumped storage plants (PSP) must switch frequently between various working conditions. Moreover, PSPs can fall easily into an S-shaped zone under low water head conditions, especially during back-to-back starting (BTBS), which reduces the stability and safety of unit operation. In this paper, a nonlinear PSP model for BTBS is established by combining an electrical subsystem with a refined hydraulic-mechanical subsystem. The influences of the hydraulic, mechanical, and electrical factors on the BTBS process are investigated quantitatively. Choosing the speed overshoot and speed stable time as the optimization objectives, and considering a variety of constraints, the multi-objective particle swarm optimization (MOPSO) algorithm is introduced to study and optimize two typical startup strategies. The results show that: (1) The parameters of a hydraulic-mechanical-electrical system have a significant impact on BTBS process, and the most unfavorable working condition corresponds to the lowest water head; (2) In the control schemes, a novel constant excitation voltage strategy is proposed based on the multi-objective optimization scheme. Compared with the constant excitation current strategy or single-objective, the optimization strategy proposed can considerably improve the speed overshoot and the speed stable time by at least 68.27% and 3.22% under the worst working conditions. (3) It is further verified that the problem of trapping in the S-shaped region under various working conditions may be avoided by the obtained optimal control scheme. The results give prominence to the effectiveness of the proposed optimization strategy for maintaining the safety and stabilization of PSP operation.
Keywords: pumped storage plant; back-to-back starting; low water head condition; constant excitation voltage; multi-objective optimization; optimal control scheme (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/2071-1050/14/16/10289/pdf (application/pdf)
https://www.mdpi.com/2071-1050/14/16/10289/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:14:y:2022:i:16:p:10289-:d:891769
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().