Predicting Maximum Work Duration for Construction Workers

Ran Yan, Wen Yi () and Shuaian Wang
Additional contact information
Ran Yan: Department of Logistics and Maritime Studies, The Hong Kong Polytechnic University, Hung Hom, Hong Kong SAR, China
Wen Yi: School of Built Environment, College of Sciences, Massey University, Auckland 0632, New Zealand
Shuaian Wang: Faculty of Business, The Hong Kong Polytechnic University, Hung Hom, Hong Kong SAR, China

Sustainability, 2022, vol. 14, issue 17, 1-12

Abstract: One of the most common health problems that threaten the transportation infrastructure construction workers in Hong Kong is heat stress. An effective way to reduce this problem is to design a proper work–rest schedule, and the key issue is predicting the maximum working duration given the different conditions of the workers and the surrounding environment, which is the research question of this study. Air temperature, an important input feature, is also determined by the maximum working duration itself, i.e., the input feature is a function of the prediction target. Therefore, the prediction model developed is different from ordinary prediction models and is hard to solve by standard statistical or machine learning models. For the prediction process, a trial-and-error algorithm is proposed to derive a solution based on two theorems that are rigorously proved; there exists a unique solution, and the solution is within a certain range in the prediction model. The proposed model and its solution approach were constructed and validated using simulated data; temperature data were collected from Hong Kong Observatory. The results showed that the mean squared error (MSE), mean absolute percentage error (MAPE), and R 2 of the test set were 0.1378, 0.1123, and 0.8182, respectively, showing that the prediction performance was generally accurate. This study can help construction practitioners and governments to rationally design the work–rest schedules of transportation infrastructure construction workers and thus protect them from the risks brought about by heat stress.

Keywords: transportation infrastructure construction workers; maximum working duration; linear regression; trial-and-error algorithm (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/2071-1050/14/17/11096/pdf (application/pdf)
https://www.mdpi.com/2071-1050/14/17/11096/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:14:y:2022:i:17:p:11096-:d:907280

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:14:y:2022:i:17:p:11096-:d:907280