Sustainable Project Management: Reducing the Risk of Cost Inaccuracy Using a PLS-SEM Approach

Ali Foroutan Mirhosseini, Kelly Pitera, James Odeck and Morten Welde
Additional contact information
Ali Foroutan Mirhosseini: Department of Civil and Environmental Engineering, Norwegian University of Science and Technology, 7491 Trondheim, Norway
Kelly Pitera: Department of Civil and Environmental Engineering, Norwegian University of Science and Technology, 7491 Trondheim, Norway
James Odeck: Department of Civil and Environmental Engineering, Norwegian University of Science and Technology, 7491 Trondheim, Norway
Morten Welde: Department of Civil and Environmental Engineering, Norwegian University of Science and Technology, 7491 Trondheim, Norway

Sustainability, 2022, vol. 14, issue 2, 1-20

Abstract: Determining the factors leading to cost inaccuracy in infrastructure projects relates to sustainability by improving the cost performance of the projects (economic sustainability) and reducing the waste of available resources (environmental sustainability). This study investigates the effects of various factors affecting the cost performance of large-scale road projects in Norway in both the planning and construction phases. To this aim, a quantitative approach using a questionnaire survey was employed to understand the attitude of practitioners towards various factors causing cost increases. An advanced multivariate statistical approach of Partial Least Square Structural Equation Modeling (PLS-SEM) and Relative Importance Index (RII) was utilized to analyze the questionnaire responses. The results of the RII analysis show that local wishes, defective estimations, and long processing times had the most impact on the cost increase during the planning phase. At the same time, scope changes, market conditions, and unforeseen ground conditions were the most influential parameters in the construction phase. Moreover, the results obtained from PLS-SEM reveal that external related factors had the most influence among the other grouped factors (i.e., pre-construction, project management and contractual relationship, contractor’s site management, and external) on cost overrun during the construction phase. Increasing the knowledge of these factors will allow for developing relevant project management approaches targeted at improving economic and environmental sustainability within both the planning and construction phases.

Keywords: cost overrun; PLS-SEM; project management; sustainability; Norway (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
https://www.mdpi.com/2071-1050/14/2/960/pdf (application/pdf)
https://www.mdpi.com/2071-1050/14/2/960/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:14:y:2022:i:2:p:960-:d:725363

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:14:y:2022:i:2:p:960-:d:725363