A Capacity Cost-Sharing Contract for a Two-Stage Supply Chain with a Risk-Averse Supplier under a Bargaining Power
Pyung-Hoi Koo
Additional contact information
Pyung-Hoi Koo: Department of Systems Management and Engineering, Pukyong National University, Busan 48513, Korea
Sustainability, 2022, vol. 14, issue 4, 1-17
Abstract:
This study considers a two-stage supply chain (SC) consisting of a single supplier and a manufacturer. When the manufacturer introduces a new product to the market, both the manufacturer and supplier should install production capacity in advance. Since capacity building often takes a long time, the demand is uncertain at the time of capacity decision making. The supplier often makes a conservative decision on capacity building to avoid possible capital risks due to excess capacity, which leads to the so-called double marginalization problem. Various risk-sharing supply contracts have recently been studied in academia to overcome the double marginalization problem. However, most existing studies ignore the bargaining power of each SC member and capacity investment. This study aims to fill the research gap by including capacity investment and bargaining power in the supply contract process. A capacity cost-sharing (CCS) contract is introduced in which the manufacturer shares the supplier’s capacity investment risk. We investigate how to set the contract parameters in the CCS contract to coordinate the supply chain. It is found that the wholesale price and manufacturer’s CCS ratio are negatively proportional to each other, and the manufacturer’s expected profit increases as the CCS ratio (wholesale price) increases (decreases) in the coordinated CCS contract. We show that there exists a CCS contract leading to a coordinated supply chain for a specific range of bargaining power. We also present a new CCS contract for a supply chain with a risk-averse supplier. A numerical illustration is provided to clarify how the contract parameters are determined and to examine the effect of the contract parameters on SC performance. Managerial implications and possible future work are discussed.
Keywords: supply contract; capacity investment; capacity cost sharing; bargaining power; risk-averse supplier; supply chain coordination (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.mdpi.com/2071-1050/14/4/2279/pdf (application/pdf)
https://www.mdpi.com/2071-1050/14/4/2279/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:14:y:2022:i:4:p:2279-:d:751546
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().