EconPapers    
Economics at your fingertips  
 

Concept-Based Integration of Project Management and Strategic Management of Rubber Dam Projects Using the SWOT–AHP Method

Mohammad Kazem Ghorbani, Hossein Hamidifar, Charalampos Skoulikaris and Michael Nones
Additional contact information
Mohammad Kazem Ghorbani: School of Civil Engineering, Iran University of Science and Technology, Tehran 16846, Iran
Hossein Hamidifar: Water Engineering Department, Shiraz University, Shiraz 71441, Iran
Charalampos Skoulikaris: Department of Civil Engineering, Aristotle University of Thessaloniki, 54124 Thessaloniki, Greece
Michael Nones: Institute of Geophysics, Polish Academy of Sciences, 01452 Warsaw, Poland

Sustainability, 2022, vol. 14, issue 5, 1-20

Abstract: The utilization of rubber dams for water supply and irrigated agriculture is becoming an emerging practice in developing countries. In this study, based on the SWOT (strengths, weaknesses, opportunities, threats) analysis, a variety of standards and processes in project management (PM) are integrated within the framework of the strategic management (SM) of an organization responsible for the management of new small-scale hydraulic infrastructures, e.g., rubber dam projects. The most important internal and external factors in PM and organizational SM of rubber dam projects in Iran are initially identified, adapted, and integrated. Thereafter, the factors are weighted, evaluated, and analyzed using the analytic hierarchy process (AHP) and combined SWOT–AHP methods. Based on the results, the total weighted scores of the internal and external factors are 2.353 and 2.718, respectively. Hence, the derived main strategy of the organization is WO. This means that the weakness factors can be reduced through the opportunities available for projects. Finally, a new methodology called “strategy matrix” resulting from “priority matrix” is proposed to prioritize and determine the organization’s possible strategies. The outputs demonstrate the first three priorities as a mix of the main strategy alternatives, e.g., W 1 O 1 , W 7 O 1 , and W 9 O 1 . The organization, hence, is proposed to use the economic benefits of rubber dam projects to further monitor organizational units, the project’s resource management, and the project’s stakeholder management (not the project’s stakeholders). The proposed research could be conceived as a pilot for sustainable management in developing countries, where strategic project management can produce important operational benefits.

Keywords: priority matrix; project management; rubber dam projects; strategic management; strategy matrix; SWOT–AHP method (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
https://www.mdpi.com/2071-1050/14/5/2541/pdf (application/pdf)
https://www.mdpi.com/2071-1050/14/5/2541/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:14:y:2022:i:5:p:2541-:d:755945

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:14:y:2022:i:5:p:2541-:d:755945