Time–Cost Schedules and Project–Threats Indication

Frantisek Kuda, Petr Dlask, Marek Teichmann and Vaclav Beran
Additional contact information
Frantisek Kuda: Department of Urban Engineering, Faculty of Civil Engineering, VSB-Technical University of Ostrava, 70800 Ostrava, Czech Republic
Petr Dlask: Department of Economic and Management in Civil Engineering, Faculty of Civil Engineering, Czech Technical University, 16636 Prague, Czech Republic
Marek Teichmann: Department of Urban Engineering, Faculty of Civil Engineering, VSB-Technical University of Ostrava, 70800 Ostrava, Czech Republic
Vaclav Beran: Department of Economics, Faculty of Economics, University of South Bohemia, 37005 České Budějovice, Czech Republic

Sustainability, 2022, vol. 14, issue 5, 1-16

Abstract: One of the most common disciplines in a business or economic project is timing and resource review. Despite the frequency of use, the level of sophistication is not high enough to maintain its level of importance. Exceeding deadlines and non-compliance with contractual costs is more than common. Moreover, there are projects where uncertainties are a naturally accompanying phenomenon. Research projects, implementation of solutions in a time-limited situation, or in an environment of limited knowledge creates risk. Any project proposal faces future realization risks when its planning management does not know with certainty where the current risks and uncertainties may come from. Decision-making, risk management dynamics, and simulations have developed in recent decades into an erudite and useful discipline. The aim is to indicate how much of the time–cost schedule proposal is stable, controllable, and economically feasible. The approach is based on the idea that modern resource scheduling requires nonlinear dynamic calculating models and simulations. The methodology presented is based on the dynamics of underlying physical and economic processes that form a spatial pattern of a time series. The article’s objective is devoted to the early indication of a dynamic project schedule’s instability and predisposition to bifurcation and chaos. In other words, the aim is to show not only what will happen but how diverse and damaging the project may become in the future.

Keywords: time scheduling; production speed; production acceleration; simulation; project costs; durations; risk evaluations; circular life cycle; management dynamic (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/2071-1050/14/5/2828/pdf (application/pdf)
https://www.mdpi.com/2071-1050/14/5/2828/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:14:y:2022:i:5:p:2828-:d:761334

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:14:y:2022:i:5:p:2828-:d:761334