On Risk Probability of Prefabricated Building Hoisting Construction Based on Multiple Correlations
Peng Wan,
Junwu Wang,
Ye Liu,
Qizhi Lu and
Chunbao Yuan
Additional contact information
Peng Wan: Engineering Management, School of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan 430070, China
Junwu Wang: Engineering Management, School of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan 430070, China
Ye Liu: Engineering Management, School of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan 430070, China
Qizhi Lu: Engineering Management, School of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan 430070, China
Chunbao Yuan: China Construction Seventh Engineering Division Corp. Ltd., Shenzhen 518000, China
Sustainability, 2022, vol. 14, issue 8, 1-18
Abstract:
With growing concern about environmental pollution and occupational safety in construction industry globally, prefabricated building has become a popular building model in sustainable society. In China, management specifications of prefabricated buildings are far from mature, and safety accidents occur frequently in construction. In order to comprehensively analyze risks in hoisting construction of prefabricated buildings, this study, in view of characteristics of hoisting construction process and correlations in complex system, summarizes risk factors and classifies them according to Wuli-Shili-Renli (WSR) system. From perspective of multiple correlations, evolution mechanism of multi-system correlation and multi-risk correlation is carried out, so as to explore risk probability of hoisting construction of prefabricated buildings. At the same time, this study extends Two Additive Choquet Integral (TACI) operator and Decision-making Trial and Evaluation Laboratory (DEMATEL) in dynamic stochastic environment to construct a two-stage model for risk probability research of hoisting construction, hoping to profoundly reveal influence of risk factors and their dynamic evolution. The results show that: (1) risk probability presented a seasonal, dynamic change trend, which meant rising first, then falling, and finally keeping rising, thus regular inspection and dynamic monitoring are required in hoisting construction in these regions in the first three quarters. (2) the influence of each risk factor demonstrated dynamic changes, and risk sources that need to prevent and defuse at different time points are varied, thus targeted measures catering to different risk sources are required. (3) the degree of risk controllability is in dynamic change, but classification of cause or result in the region at the period remains the same, thus necessitating targeted response measures aimed at various risk types. (4) Individual risks like hoisting job climated break out periodically, so the law of risk occurrence should be mastered and relative precautionary measures should be taken in advance.
Keywords: prefabricated building; Wuli-Shili-Renli (WSR) system; multiple correlations; dynamic stochastic; Decision-making Trial and Evaluation Laboratory (DEMATEL); two-stage model (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/2071-1050/14/8/4430/pdf (application/pdf)
https://www.mdpi.com/2071-1050/14/8/4430/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:14:y:2022:i:8:p:4430-:d:789474
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().