Research on the Optimization of Cutting Path of Cantilever Roadheader in Large Section Excavation
Chengjun Hu,
Yong Zhang,
Rui Yu,
Xinqiu Fang,
Ziyue Xu,
Lixin Wang and
Baofu Zhao
Additional contact information
Chengjun Hu: School of Energy and Mining Engineering, China University of Mining and Technology (Beijing), Beijing 100083, China
Yong Zhang: School of Energy and Mining Engineering, China University of Mining and Technology (Beijing), Beijing 100083, China
Rui Yu: School of Mines, China University of Mining and Technology, Xuzhou 221116, China
Xinqiu Fang: School of Mines, China University of Mining and Technology, Xuzhou 221116, China
Ziyue Xu: School of Mines, China University of Mining and Technology, Xuzhou 221116, China
Lixin Wang: China Coal Tianjin Underground Engineering Intelligence Research Institute, Tianjin 561000, China
Baofu Zhao: China Coal Tianjin Underground Engineering Intelligence Research Institute, Tianjin 561000, China
Sustainability, 2022, vol. 14, issue 9, 1-18
Abstract:
Coal is an important resource for China and even for the whole world. With the improvement of mechanization, automation and intelligence of coal mining equipment in China, there has been an imbalance between the speed of mining and of excavating. Adopting efficient cutting paths is beneficial to improving roadway excavation efficiency and alleviating the imbalance between mining and excavation. In this paper, taking the 12307 belt roadway of Wangjialing Coal Mine as the research background, the geomechanical parameters and distribution characteristics of the surrounding rock were observed and studied, and the test results of in-situ stress, surrounding rock structure and surrounding rock strength were obtained. Based on the test results, a numerical model was established, and the stress and displacement distribution law of the surrounding rock of the roadway under different cutting paths were analyzed, and two optimal cutting paths were proposed based on the actual situation, and industrial tests were carried out. The test results show that using the “snake” cutting path from bottom to top, the roadway section forming effect is good, and a single cycle excavation takes 34 min, which verified the effectiveness of the cutting path design. On the basis of specific engineering geological conditions, excavation equipment and technology, combined with experimental testing, numerical simulation and other methods, the roadway excavation cutting path can be optimized, and the research results can provide a reference for the design of cutting paths for coal mine excavation roadways with the same geological conditions.
Keywords: cantilever roadheader; surrounding rock properties; numerical simulation; cutting path; large section roadway (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2022
References: View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
https://www.mdpi.com/2071-1050/14/9/5345/pdf (application/pdf)
https://www.mdpi.com/2071-1050/14/9/5345/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:14:y:2022:i:9:p:5345-:d:804866
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().