On Use of Construction Technology Designs for Expert Opinions
Čeněk Jarský,
Miloslava Popenková,
Jozef Gašparík and
Patrik Šťastný
Additional contact information
Čeněk Jarský: Department of Construction Technology, Faculty of Civil Engineering, CTU in Prague, Thákurova 7, 166 29 Prague, Czech Republic
Miloslava Popenková: Department of Construction Technology, Faculty of Civil Engineering, CTU in Prague, Thákurova 7, 166 29 Prague, Czech Republic
Jozef Gašparík: Department of Building Technology, Faculty of Civil Engineering, Slovak University of Technology in Bratislava, 810 05 Bratislava, Slovakia
Patrik Šťastný: Department of Building Technology, Faculty of Civil Engineering, Slovak University of Technology in Bratislava, 810 05 Bratislava, Slovakia
Sustainability, 2022, vol. 14, issue 9, 1-12
Abstract:
This article describes the basic principles and results of an expert system for construction planning and management. In the field of expert opinions, the system greatly helps to determine the limit of unreasonably low construction prices on the basis of a rapid cost analysis. Additionally, it can determine the technologically shortest possible construction periods or can answer the question of whether it is possible to complete the construction in the specified period, provided that a certain amount of construction is currently underway, which is very useful in expert opinions. The system is based on modeling the construction process using the so-called construction technology network graphs. This method allows, among other things, to create and use so-called typical network graphs as preprepared models of individual types of objects in the form of computer files, which can be modified according to the spatial structure of real buildings or facilities when used in creating a feasibility study or efficient time and financial planning and management of the building process. The system also enables the automatic creation of quality assurance checklists (inspection and acceptance plans for quality assurance), environmental plans (plans for the elimination of adverse effects of construction activities on the environment), and safety and health plans. Direct links to the bills of quantities (list of works and supplies with numbering of individual items), budgets (list of works and supplies with prices), or production calculations, despite the operational records of the actual construction process also on the company’s accounting agenda, are available.
Keywords: financial and time planning; construction technology design; expert opinions; management of projects; computer model (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.mdpi.com/2071-1050/14/9/5672/pdf (application/pdf)
https://www.mdpi.com/2071-1050/14/9/5672/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:14:y:2022:i:9:p:5672-:d:810831
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().