Research on Full-Element and Multi-Time-Scale Modeling Method of BIM for Lean Construction
Xuefeng Zhao,
Haodong Chen,
Jing Liu (),
Jiaqi Liu,
Meng Zhang,
Yibing Tao,
Junbo Li and
Xuyang Wang
Additional contact information
Xuefeng Zhao: Faculty of Architecture, Civil and Transportation Engineering, Beijing University of Technology, 100 Pingleyuan, Chaoyang District, Beijing 100124, China
Haodong Chen: Faculty of Architecture, Civil and Transportation Engineering, Beijing University of Technology, 100 Pingleyuan, Chaoyang District, Beijing 100124, China
Jing Liu: School of Economics and Management, Beijing Jiaotong University, 3 Shangyuancun, Haidian District, Beijing 100044, China
Jiaqi Liu: Faculty of Architecture, Civil and Transportation Engineering, Beijing University of Technology, 100 Pingleyuan, Chaoyang District, Beijing 100124, China
Meng Zhang: Faculty of Architecture, Civil and Transportation Engineering, Beijing University of Technology, 100 Pingleyuan, Chaoyang District, Beijing 100124, China
Yibing Tao: Faculty of Architecture, Civil and Transportation Engineering, Beijing University of Technology, 100 Pingleyuan, Chaoyang District, Beijing 100124, China
Junbo Li: Faculty of Architecture, Civil and Transportation Engineering, Beijing University of Technology, 100 Pingleyuan, Chaoyang District, Beijing 100124, China
Xuyang Wang: Faculty of Architecture, Civil and Transportation Engineering, Beijing University of Technology, 100 Pingleyuan, Chaoyang District, Beijing 100124, China
Sustainability, 2023, vol. 15, issue 17, 1-17
Abstract:
Building Information Modeling (BIM) is a very effective technology for supporting lean construction. However, the current application of BIM during the construction phase does not incorporate all necessary elements of the construction site in a comprehensive manner. Additionally, the depiction of the construction process lacks the desired level of detail. These limitations impede the application of BIM-based lean construction. In this paper, we propose a full-element and multi-time-scale modeling approach to BIM during the construction phase. Our method first establishes a full-element model by reconstructing the main body of the building based on construction subdivision dimensions, construction technology, and management objectives. We then create a three-dimensional model that includes a process elements model of circulating materials, temporary facilities, construction machinery, and surrounding environmental elements. The integrated model of these elements provides a comprehensive representation of BIM at any static time point. Second, we conduct multi-time-scale simulations based on the full-element model. Our approach divides the entire time, local time, and special time points into three scales to simulate project progress, local structure construction technology, and working conditions. A case study of the Daxing International Airport construction project verifies that our method can achieve lean management of construction resources. Full-element modeling provides a comprehensive BIM representation at any static time point, thereby supporting lean construction by improving construction resource management, reducing costs, and enhancing efficiency.
Keywords: BIM; lean construction; full-element; comprehensive progress simulation (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/2071-1050/15/17/12717/pdf (application/pdf)
https://www.mdpi.com/2071-1050/15/17/12717/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:15:y:2023:i:17:p:12717-:d:1222718
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().