EconPapers    
Economics at your fingertips  
 

Modeling to Achieve Area Business Continuity Management Implementation via a Fuzzy Cognitive Map

Kunruthai Meechang () and Kenji Watanabe
Additional contact information
Kunruthai Meechang: Department of Architecture, Civil Engineering and Industrial Management Engineering, Nagoya Institute of Technology, Gokiso-cho, Showa-ku, Nagoya 466-8555, Aichi, Japan
Kenji Watanabe: Department of Architecture, Civil Engineering and Industrial Management Engineering, Nagoya Institute of Technology, Gokiso-cho, Showa-ku, Nagoya 466-8555, Aichi, Japan

Sustainability, 2023, vol. 15, issue 18, 1-22

Abstract: Area business continuity management (Area-BCM) is introduced to enhance sustainable economic growth by building public–private partnerships. It is implemented in pilot industrial zones in disaster-prone regions to tackle problems beyond a single organization’s capacity. The framework emphasizes multiple stakeholders in the decision-making process, but participation and implementation remain major challenges for many practitioners in the search for potential pathways. Therefore, this study presents a model of causal relationships between concepts to achieve the implementation of Area-BCM. To capture expert perceptions and visualize relationships, a fuzzy cognitive map (FCM) is deployed. The use of fuzzy logic facilitates the integration of diverse viewpoints and the representation of ambiguous and complex scenarios. Initially, 28 appropriate concepts were identified by reviewing the literature on practical Area-BCM cases, which were then scrutinized by experts, including eight driving causes, eleven required actions, and nine outcome variables. Subsequently, FCMs were constructed through individual interviews. Since the FCMs had been aggregated, a scenario analysis was performed under five different conditions to evaluate potential strategies. The simulation results present promising concepts that could improve Area-BCM implementation. The findings emphasize that these strategies will have a positive influence when top management is committed, government support is achieved, and workshops exist.

Keywords: area business continuity management; implementation; disaster; fuzzy cognitive map; strategy development (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/2071-1050/15/18/13531/pdf (application/pdf)
https://www.mdpi.com/2071-1050/15/18/13531/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:15:y:2023:i:18:p:13531-:d:1236874

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:15:y:2023:i:18:p:13531-:d:1236874