Study on the Stress Distribution and Stability Control of Surrounding Rock of Reserved Roadway with Hard Roof
Yuxi Hao,
Mingliang Li,
Wen Wang (),
Zhizeng Zhang and
Zhun Li
Additional contact information
Yuxi Hao: School of Architectural Engineering, Zhongyuan University of Technology, Zhengzhou 450007, China
Mingliang Li: School of Architectural Engineering, Zhongyuan University of Technology, Zhengzhou 450007, China
Wen Wang: College of Energy Science and Engineering, Henan Polytechnic University, Jiaozuo 454000, China
Zhizeng Zhang: School of Architectural Engineering, Zhongyuan University of Technology, Zhengzhou 450007, China
Zhun Li: School of Architectural Engineering, Zhongyuan University of Technology, Zhengzhou 450007, China
Sustainability, 2023, vol. 15, issue 19, 1-21
Abstract:
According to field observation and theoretical analysis, the failure of the 1523103 reserved roadway is mainly affected by the lateral support pressure, rock mass strength, and support mode. With the mining of the 152309 working face, the lateral pressure of coal pillars on both sides of the reserved roadway increases, and since the lithology of the two sides and the floor of the roadway is weak, the reserved roadway experiences spalling and floor heave. Through numerical simulation, the distribution law of surrounding rock stress and the displacement of surrounding rock are obtained after the roof cutting and pressure relief of the reserved roadway with hard roof. According to the cause of surrounding rock failure of a reserved roadway, the combined control technology of roof cutting and pressure relief, grouting anchor cable support, and bolt support is put forward. After cutting the roof and releasing the pressure on the working face, the lateral support pressure of the two sides of the roadway is significantly reduced, the deformation of the two sides of the roadway is small, the maximum shrinkage rate of the section is reduced from 70% to 11%, and the deformation of the surrounding rock of the 1523103 reserved roadway is effectively controlled. The successful control of the surrounding rock in the 1523103 tunnel reduces the number of coal pillars to be installed, improves the coal extraction rate, and is conducive to the sustainable utilization of limited natural resources and the sustainable development of the coal industry.
Keywords: reserved roadway; roof cutting and pressure releasing; surrounding rock damage; hard roof; grouting anchor (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.mdpi.com/2071-1050/15/19/14111/pdf (application/pdf)
https://www.mdpi.com/2071-1050/15/19/14111/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:15:y:2023:i:19:p:14111-:d:1246299
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().