Delay in Decision-Making Affecting Construction Projects: A Sustainable Decision-Making Model for Mega Projects
Shabir Hussain Khahro (),
Haseeb Haleem Shaikh,
Noor Yasmin Zainun,
Basel Sultan () and
Qasim Hussain Khahro
Additional contact information
Shabir Hussain Khahro: Department of Engineering Management, College of Engineering, Prince Sultan University, Riyadh 11586, Saudi Arabia
Haseeb Haleem Shaikh: Jamilus Research Center, Faculty of Civil Engineering & Built Environment, Universiti Tun Hussein Onn Malaysia, Parit Raja, Batu Pahat 86400, Malaysia
Noor Yasmin Zainun: Jamilus Research Center, Faculty of Civil Engineering & Built Environment, Universiti Tun Hussein Onn Malaysia, Parit Raja, Batu Pahat 86400, Malaysia
Basel Sultan: Department of Engineering Management, College of Engineering, Prince Sultan University, Riyadh 11586, Saudi Arabia
Qasim Hussain Khahro: Jamilus Research Center, Faculty of Civil Engineering & Built Environment, Universiti Tun Hussein Onn Malaysia, Parit Raja, Batu Pahat 86400, Malaysia
Sustainability, 2023, vol. 15, issue 7, 1-22
Abstract:
The construction industry is one of the world’s fastest-growing industries, since it directly and indirectly contributes to several other industries. It has been observed that delays in the decision making of important stakeholders negatively impact construction projects. Thus, this has multiple consequences on project performance. Consequently, the purpose of this study was to identify the primary causes of delayed decision-making and offer a decision support model for timely construction project decisions. For factor identification, a comprehensive literature analysis was conducted, followed by an analysis of questionnaire responses of ninety-one professionals. For data analysis, the relative importance index (RII) method was applied. The results indicate that client decision-making delays pose a substantial obstacle for building projects. The early decision-making process is impacted by a lack of technical competence, incomplete paperwork, poor leadership, and coordination/communication issues. The proposed model could also assist project practitioners in improving their project decision making. This research study encourages stakeholders to create and implement an efficient decision-making procedure for timely project decisions. A procedure for decision making that is successful could decrease delays in the decision-making process and prevent conflicts and disputes in projects.
Keywords: construction industry; decision making; delay; construction process; large-scale projects (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
https://www.mdpi.com/2071-1050/15/7/5872/pdf (application/pdf)
https://www.mdpi.com/2071-1050/15/7/5872/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:15:y:2023:i:7:p:5872-:d:1109642
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().