Development of a Cost Prediction Model for Design Changes: Case of Korean Apartment Housing Projects

Ie-Sle Ahn, Jae-Jun Kim and Joo-Sung Lee ()
Additional contact information
Ie-Sle Ahn: Department of Architectural Engineering, Hanyang University, 222, Wangsipri-ro, Sungdong-gu, Seoul 04763, Republic of Korea
Jae-Jun Kim: Department of Architectural Engineering, Hanyang University, 222, Wangsipri-ro, Sungdong-gu, Seoul 04763, Republic of Korea
Joo-Sung Lee: Division of Architecture and Civil Engineering, Kangwon National University, 346, Jungang-ro, Samcheok-si 25913, Gangwon-do, Republic of Korea

Sustainability, 2024, vol. 16, issue 11, 1-19

Abstract: Apartment buildings are significantly popular among South Korean construction companies. However, design changes present a common yet challenging aspect, often leading to cost overruns. Traditional cost prediction methods, which primarily rely on numerical data, have a gap in fully capitalizing on the rich insights that textual descriptions of design changes offer. Addressing this gap, this research employs machine learning (ML) and natural language processing (NLP) techniques, analyzing a dataset of 35,194 instances of design changes from 517 projects by a major public real estate developer. The proposed models demonstrate acceptable performance, with R-square values ranging from 0.930 to 0.985, underscoring the potential of integrating structured and unstructured data for enhanced predictive analytics in construction project management. The predictor using Extreme Gradient Boosting (XGB) shows better predictive ability (R 2 = 0.930; MAE = 16.05; RMSE = 75.09) compared to the traditional Multilinear Regression (MLR) model (R 2 = 0.585; MAE = 43.85; RMSE = 101.41). For whole project cost changes predictions, the proposed models exhibit good predictive ability, both including price fluctuations (R 2 = 0.985; MAE = 605.1; RMSE = 1009.5) and excluding price fluctuations (R 2 = 0.982; MAE = 302.1; RMSE = 548.5). Additionally, a stacked model combining CatBoost and Support Vector Machine (SVM) algorithms was developed, showcasing the effective prediction of cost changes, with or without price fluctuations.

Keywords: design changes; cost prediction; natural language processing (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2024
References: View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/2071-1050/16/11/4322/pdf (application/pdf)
https://www.mdpi.com/2071-1050/16/11/4322/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:16:y:2024:i:11:p:4322-:d:1398455

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:16:y:2024:i:11:p:4322-:d:1398455