Influence of Technical Reasons on Cost Overruns of Infrastructural Projects: A Sustainable Development Perspective
Marijo Lovrinčević (),
Mladen Vukomanović () and
Romano Perić
Additional contact information
Marijo Lovrinčević: Ariozo d.o.o., Put Meja 16, 21000 Split, Croatia
Mladen Vukomanović: Department for Construction Management and Economics, Faculty of Civil Engineering, University of Zagreb, Fra Andrije Kačića-Miošića 26, 10000 Zagreb, Croatia
Romano Perić: BIM Projekt d.o.o., Kupska 2, 10000 Zagreb, Croatia
Sustainability, 2024, vol. 16, issue 21, 1-20
Abstract:
Cost overruns are a significant issue in infrastructure projects, adversely affecting not only economic performance but also sustainability goals by straining resources and extending project timelines. There is consensus among researchers about the persistence of cost overruns and the importance of accurate estimates. However, there are significant differences in the explanation of the reasons for the overruns. While we recognize the importance of understanding the reasons for cost overruns at all stages of project development, we have focused on the reasons for cost overruns after contract award due to the rarely available real and valid data collected at the source of the information. We analyze the deviations between actual and contracted costs, as well as the dependence of cost deviations of individual project types on the size of the contract. For example, the size of the tunnel significantly affects relative cost deviations, while for standard viaducts or road sections this effect is minimal. The results confirmed that cost overruns are less frequent in standard facilities than in those where the experience factor has little influence on the final cost estimate. For example, deviations in the average value of the contracted costs for highway sections range between −12.1% and 27.9% of the contracted value, and for standardized viaduct projects they range between −16.73% and 6.27% of the contracted value. The type of distribution function of deviations between actual and contractually agreed costs was investigated, and a predictive model for estimating future cost deviations of project programs was presented. The goal is to improve economic sustainability and the related optimization of resources in the development of infrastructure, which contributes to the broader agenda of sustainable development. The results encourage the adoption of improved project documentation and forecasting tools, which are essential for sustainable project management.
Keywords: sustainability; cost overruns; infrastructure projects; technical errors; forecasting; sustainable development; economic efficiency; project management; resource optimization (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2024
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/2071-1050/16/21/9413/pdf (application/pdf)
https://www.mdpi.com/2071-1050/16/21/9413/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:16:y:2024:i:21:p:9413-:d:1509810
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().