Implementing BIM and Lean Construction Methods for the Improved Performance of a Construction Project at the Disassembly and Reuse Stage: A Case Study in Dezhou, China

Shanggang Hei, Hong Zhang (), Shen Luo, Ruizhe Zhang, Chao Zhou, Meng Cong and Hongyu Ye
Additional contact information
Shanggang Hei: School of Architecture, Southeast University, Nanjing 210096, China
Hong Zhang: School of Architecture, Southeast University, Nanjing 210096, China
Shen Luo: Architects & Engineers Co., Ltd. of Southeast University, Nanjing 210096, China
Ruizhe Zhang: School of Architecture, Southeast University, Nanjing 210096, China
Chao Zhou: School of Architecture, Southeast University, Nanjing 210096, China
Meng Cong: Architects & Engineers Co., Ltd. of Southeast University, Nanjing 210096, China
Hongyu Ye: School of Architecture, Southeast University, Nanjing 210096, China

Sustainability, 2024, vol. 16, issue 2, 1-25

Abstract: The construction industry is adopting a collaborative paradigm by combining Lean construction (LC) principles and BIM capabilities. Existing studies lack sufficient case studies and performance evaluations, especially for the disassembly and reconstruction stage, creating a gap in the practical application of BIM and Lean construction (BIM-LC) in China. To bridge this gap, this study quantitatively assessed the BIM-LC methodology in a relocation project in Dezhou, China. The project employed BIM-LC practices such as the Last-Planner System (LPS), Just-In-Time (JIT), Kanban, Value-Stream Mapping (VSM), and Continuous Improvement to enhance construction efficiency and minimize waste. Two main areas of the relocation process were investigated: (i) the identification of common barriers and on-site solutions to the implementation of BIM-LC; (ii) evaluation of the construction efficiency, construction and demolition waste (CDW), and carbon-emission performance. The results showed that the BIM-LC strategy improved labor efficiency and productivity by 3.4% and 12.9%, shortened the construction period by 11 days, reduced construction costs by 8.07% (i.e., USD 9093.8), and reduced transportation costs by 12.5% (i.e., USD 1875). The CDW generation rate ranged from 1–5%, which is comparable to the rates observed in residential construction across various countries. The total weight was 1903.8 kg (10.4 kg/m 2 ). Moreover, the carbon emission during the relocation process was 15,288.4 kgCO 2 e, with a carbon intensity of 83.5 kg/m 2 . This study extends the knowledge systems on the application of the BIM-LC method in relocation projects and supports data-driven decision making. It also plays a crucial role in fostering new markets for recycled components, contributing to the realization of a sustainable built environment.

Keywords: lean construction (LC); building information modeling (BIM); last planner system (LPS); value-stream mapping (VSM); construction and demolition waste (CDW); carbon emission (CE); building relocation (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2024
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
https://www.mdpi.com/2071-1050/16/2/656/pdf (application/pdf)
https://www.mdpi.com/2071-1050/16/2/656/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:16:y:2024:i:2:p:656-:d:1317524

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:16:y:2024:i:2:p:656-:d:1317524