Implementing BIM and Lean Construction Methods for the Improved Performance of a Construction Project at the Disassembly and Reuse Stage: A Case Study in Dezhou, China
Shanggang Hei,
Hong Zhang (),
Shen Luo,
Ruizhe Zhang,
Chao Zhou,
Meng Cong and
Hongyu Ye
Additional contact information
Shanggang Hei: School of Architecture, Southeast University, Nanjing 210096, China
Hong Zhang: School of Architecture, Southeast University, Nanjing 210096, China
Shen Luo: Architects & Engineers Co., Ltd. of Southeast University, Nanjing 210096, China
Ruizhe Zhang: School of Architecture, Southeast University, Nanjing 210096, China
Chao Zhou: School of Architecture, Southeast University, Nanjing 210096, China
Meng Cong: Architects & Engineers Co., Ltd. of Southeast University, Nanjing 210096, China
Hongyu Ye: School of Architecture, Southeast University, Nanjing 210096, China
Sustainability, 2024, vol. 16, issue 2, 1-25
Abstract:
The construction industry is adopting a collaborative paradigm by combining Lean construction (LC) principles and BIM capabilities. Existing studies lack sufficient case studies and performance evaluations, especially for the disassembly and reconstruction stage, creating a gap in the practical application of BIM and Lean construction (BIM-LC) in China. To bridge this gap, this study quantitatively assessed the BIM-LC methodology in a relocation project in Dezhou, China. The project employed BIM-LC practices such as the Last-Planner System (LPS), Just-In-Time (JIT), Kanban, Value-Stream Mapping (VSM), and Continuous Improvement to enhance construction efficiency and minimize waste. Two main areas of the relocation process were investigated: (i) the identification of common barriers and on-site solutions to the implementation of BIM-LC; (ii) evaluation of the construction efficiency, construction and demolition waste (CDW), and carbon-emission performance. The results showed that the BIM-LC strategy improved labor efficiency and productivity by 3.4% and 12.9%, shortened the construction period by 11 days, reduced construction costs by 8.07% (i.e., USD 9093.8), and reduced transportation costs by 12.5% (i.e., USD 1875). The CDW generation rate ranged from 1–5%, which is comparable to the rates observed in residential construction across various countries. The total weight was 1903.8 kg (10.4 kg/m 2 ). Moreover, the carbon emission during the relocation process was 15,288.4 kgCO 2 e, with a carbon intensity of 83.5 kg/m 2 . This study extends the knowledge systems on the application of the BIM-LC method in relocation projects and supports data-driven decision making. It also plays a crucial role in fostering new markets for recycled components, contributing to the realization of a sustainable built environment.
Keywords: lean construction (LC); building information modeling (BIM); last planner system (LPS); value-stream mapping (VSM); construction and demolition waste (CDW); carbon emission (CE); building relocation (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2024
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.mdpi.com/2071-1050/16/2/656/pdf (application/pdf)
https://www.mdpi.com/2071-1050/16/2/656/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:16:y:2024:i:2:p:656-:d:1317524
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().