Economic and Technical Aspects of Power Grids with Electric Vehicle Charge Stations, Sustainable Energies, and Compensators

Minh Phuc Duong, My-Ha Le, Thang Trung Nguyen, Minh Quan Duong () and Anh Tuan Doan
Additional contact information
Minh Phuc Duong: Power System Optimization Research Group, Faculty of Electrical and Electronics Engineering, Ton Duc Thang University, Ho Chi Minh City 700000, Vietnam
My-Ha Le: Faculty of Electrical and Electronics Engineering, Ho Chi Minh City University of Technology and Education, Ho Chi Minh City 700000, Vietnam
Thang Trung Nguyen: Power System Optimization Research Group, Faculty of Electrical and Electronics Engineering, Ton Duc Thang University, Ho Chi Minh City 700000, Vietnam
Minh Quan Duong: University of Science and Technology, The University of Danang, Danang City 550000, Vietnam
Anh Tuan Doan: University of Science and Technology, The University of Danang, Danang City 550000, Vietnam

Sustainability, 2025, vol. 17, issue 1, 1-32

Abstract: The study applies the black kite algorithm (BKA), equilibrium optimizer (EO), and secretary bird optimization algorithm (SBOA) to optimize the placement of electric vehicle charge stations (EVCSs), wind turbine stations (WTSs), photovoltaic units (PVUs), and capacitor banks (CAPBs) in the IEEE 69-node distribution power grid. Three single objectives, including power loss minimization, grid power minimization, and total voltage deviation improvement, are considered. For each objective function, five scenarios are simulated under one single operation hour, including (1) place-only EVCSs; (2) place EVCSs and PVUs; (3) place EVCSs, PVUs, and CAPBs; (4) EVCSs and WTSs; and (5) EVCSs, PVUs, WTSs, and CAPBs. The results indicate that the EO can find the best solutions for the five scenarios. The results indicate that the EO and SBOA are the two powerful algorithms that can find optimal solutions for simulation cases. For one operating day, the total grid energy that is supplied to base loads and charge stations is 80,153.1 kWh, and many nodes at high load factors violate the lower limit of 0.95 pu. As for installing more renewable power sources, the energy that the base loads and charge stations need to supply from the grid is 39,713.4 kWh. As more capacitor banks are installed, the energy demand continues to be reduced to 39,578.9 kWh. The energy reduction is greater than 50% of the demand of all base loads and charge stations. Furthermore, the voltage can be significantly improved up to higher than 0.95 pu, and a few nodes at a few hours fall into the lowest range. Thus, the study concludes that the economic and technical aspects can be guaranteed for DPGs with additional installation of EVCSs.

Keywords: electric vehicle charging station; capacitor banks; solar photovoltaic units; wind turbines; metaheuristic algorithms (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2025
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/2071-1050/17/1/376/pdf (application/pdf)
https://www.mdpi.com/2071-1050/17/1/376/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:17:y:2025:i:1:p:376-:d:1561312

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:17:y:2025:i:1:p:376-:d:1561312