BIM Uses for Mitigating Deficiencies in Road Scheduling Planning
Karen Castañeda,
Omar Sánchez,
Carlos A. Peña,
Rodrigo F. Herrera () and
Guillermo Mejía
Additional contact information
Karen Castañeda: School of Civil Engineering, Pontificia Universidad Católica de Valparaíso, Valparaíso 2374631, Chile
Omar Sánchez: Department of Civil Engineering, Pontificia Universidad Javeriana, Bogotá D.C. 111711, Colombia
Carlos A. Peña: Department of Civil Engineering, Universitat Politècnica de València, 46022 Valencia, Spain
Rodrigo F. Herrera: School of Civil Engineering, Pontificia Universidad Católica de Valparaíso, Valparaíso 2374631, Chile
Guillermo Mejía: Department of Civil Engineering, Universidad Industrial de Santander, Bucaramanga 680002, Colombia
Sustainability, 2025, vol. 17, issue 6, 1-26
Abstract:
Efficient scheduling is essential for successful and sustainable road construction projects. However, conventional planning approaches often lack adaptability, visualization, and integration with modern technologies, leading to schedule deficiencies and cost overruns. Therefore, this paper studies the influence of BIM uses in mitigating planning deficiencies in road construction scheduling. A four-stage research method was employed: (1) identification of BIM uses relevant to road projects, (2) determination of principal causes contributing to scheduling deficiencies, (3) cross-impact analysis to quantify BIM’s influence on these deficiencies, and (4) expert interviews to characterize key BIM uses. Results highlight that 4D construction planning, quantity take-off and cost estimation, and traffic management planning positively impact road scheduling, reducing errors in work breakdown structures, resource allocation, and coordination between project stakeholders. BIM streamlines communication, supports proactive risk management, and enables real-time schedule adjustments by providing an integrated digital environment. This research shows the advantages of applying BIM in road construction to improve project planning, curtail scheduling setbacks, and encourage adopting innovative practices. The results provide information that planners can utilize to enhance the use of BIM in scheduling road construction projects.
Keywords: BIM; scheduling; construction planning; road infrastructure; deficiencies; cross impact matrix (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2025
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/2071-1050/17/6/2729/pdf (application/pdf)
https://www.mdpi.com/2071-1050/17/6/2729/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:17:y:2025:i:6:p:2729-:d:1615823
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().