Key Determinant Derivations for Information Technology Disaster Recovery Site Selection by the Multi-Criterion Decision Making Method
Chia-Lee Yang,
Benjamin J. C. Yuan and
Chi-Yo Huang
Additional contact information
Chia-Lee Yang: Institute of Management of Technology, National Chiao-Tung University, Hsinchu 300, Taiwan
Benjamin J. C. Yuan: Institute of Management of Technology, National Chiao-Tung University, Hsinchu 300, Taiwan
Chi-Yo Huang: Department of Industrial Education, National Taiwan Normal University, Taipei 106, Taiwan
Sustainability, 2015, vol. 7, issue 5, 1-40
Abstract:
Disaster recovery sites are an important mechanism in continuous IT system operations. Such mechanisms can sustain IT availability and reduce business losses during natural or human-made disasters. Concerning the cost and risk aspects, the IT disaster-recovery site selection problems are multi-criterion decision making (MCDM) problems in nature. For such problems, the decision aspects include the availability of the service, recovery time requirements, service performance, and more. The importance and complexities of IT disaster recovery sites increases with advances in IT and the categories of possible disasters. The modern IT disaster recovery site selection process requires further investigation. However, very few researchers tried to study related issues during past years based on the authors’ extremely limited knowledge. Thus, this paper aims to derive the aspects and criteria for evaluating and selecting a modern IT disaster recovery site. A hybrid MCDM framework consisting of the Decision Making Trial and Evaluation Laboratory (DEMATEL) and the Analytic Network Process (ANP) will be proposed to construct the complex influence relations between aspects as well as criteria and further, derive weight associated with each aspect and criteria. The criteria with higher weight can be used for evaluating and selecting the most suitable IT disaster recovery sites. In the future, the proposed analytic framework can be used for evaluating and selecting a disaster recovery site for data centers by public institutes or private firms.
Keywords: disaster recovery (DR); site selection; business continuity (BC); data center (DC); decision making trial and evaluation laboratory (DEMATEL); analytic network process (ANP) (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2015
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (11)
Downloads: (external link)
https://www.mdpi.com/2071-1050/7/5/6149/pdf (application/pdf)
https://www.mdpi.com/2071-1050/7/5/6149/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:7:y:2015:i:5:p:6149-6188:d:49817
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().