EconPapers    
Economics at your fingertips  
 

Risk Evaluation of Qinghai–Tibet Power Grid Interconnection Project for Sustainability

Cunbin Li, Yunqi Liu and Shuke Li
Additional contact information
Cunbin Li: School of Economics and Management, North China Electric Power University, Beijing 102206, China
Yunqi Liu: School of Economics and Management, North China Electric Power University, Beijing 102206, China
Shuke Li: School of Economics and Management, North China Electric Power University, Beijing 102206, China

Sustainability, 2016, vol. 8, issue 1, 1-19

Abstract: The Qinghai–Tibet power grid interconnection project is the first power transmission project with the highest altitude, longest transmission lines, longest distance running across the plateau frozen ground, and highest iron tower in the world. The risk evaluation on it can identify the overall risk level and key risk factors, which can reduce risk-induced loss and promote sustainable construction. In this paper, the risk of the Qinghai–Tibet power grid interconnection project was evaluated by employing a matter-element extension model under a fuzzy environment. After building the risk evaluation index system, the performances and weights of criteria were qualitatively judged by three groups of experts in different fields, and then the risk of the Qinghai–Tibet power grid interconnection project was rated by employing matter-element extension model. Meanwhile, the sensitivity analysis was performed to identify key risk criteria. The empirical results indicate the risk of the Qinghai–Tibet power grid interconnection project belongs to the “stronger” grade, tending to the “strongest” grade. “Social stability risk”, “altitude sickness seizure risk”, “permafrost-induced risk”, “severe weather-induced risk”, and “ecological destruction risk” are key sub-criteria, which should be paid more attention to when taking risk management measures. Finally, some countermeasures for key risks of the Qinghai–Tibet power grid interconnection project were given. The findings in this paper can provide references for engineering managers and related stakeholders.

Keywords: risk evaluation; Qinghai–Tibet power grid interconnection project; matter-element extension model; fuzzy theory; sensitivity analysis; sustainability (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2016
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (4)

Downloads: (external link)
https://www.mdpi.com/2071-1050/8/1/85/pdf (application/pdf)
https://www.mdpi.com/2071-1050/8/1/85/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:8:y:2016:i:1:p:85-:d:62344

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-24
Handle: RePEc:gam:jsusta:v:8:y:2016:i:1:p:85-:d:62344