Developing and Implementing a Risk Analysis-Based Model for Effective Management of Protected Areas
Yehia Miky (),
Usama Hamed Issa,
Kamil Faisal,
Moataz Nael Kordi and
Khalaf Finassani Alshammari
Additional contact information
Yehia Miky: Department of Geomatics, Faculty of Architecture and Planning, King Abdulaziz University, Jeddah 21589, Saudi Arabia
Usama Hamed Issa: Civil Engineering Department, College of Engineering, Taif University, P.O. Box 11099, Taif 21944, Saudi Arabia
Kamil Faisal: Department of Geomatics, Faculty of Architecture and Planning, King Abdulaziz University, Jeddah 21589, Saudi Arabia
Moataz Nael Kordi: King Abdulaziz City for Science and Technology (KACST), Riyadh 12354, Saudi Arabia
Khalaf Finassani Alshammari: National Centre of Wildlife (NCW), Riyadh 12742, Saudi Arabia
World, 2024, vol. 5, issue 4, 1-22
Abstract:
Managing protected areas (PAs) supports protecting biodiversity and preserves ecological functions. Many risks associated with PAs management affect the most important goals of PAs including sustainability, effectiveness, and ecological balance. This work aims to define the most predictable risk factors affecting PAs management as well as to introduce a model for assessing and exploring the influences of the identified risk factors on PAs management. Fifty-four risk factors affecting the PAs management goals are defined under seven risk groups including general and fundamental preparations, monitoring system, protocols, and implementation plans, training, visitors, employees, and activities conducted within the PAs. Many characteristics of risk factors such as presence rate and impacts on sustainability, effectiveness, and ecological balance goals are introduced. Fuzzy logic is utilized in developing the proposed risk model and applied using data collected in the Kingdom of Saudi Arabia. Various relationships are introduced among risk indices that impact PAs management goals, ensuring close relations among all indices. The results highlight various important risk factors, such as the “Absence of mechanisms for early warning of disasters affecting protected areas”, and the “Lack of a system for monitoring the occurrence development and spread of disasters”. A risk group related to the monitoring system has been identified as causing the highest risk impacting the management of PAs. Further, most of the risk impacts on the three goals are due to protocols and implementation plans group. This work presents a new strategy to support managing PAs in Saudi Arabia, which can be easily adapted for application in other countries.
Keywords: protected areas; sustainability; fuzzy logic; risk analysis (search for similar items in EconPapers)
JEL-codes: G15 G17 G18 L21 L22 L25 L26 Q42 Q43 Q47 Q48 R51 R52 R58 (search for similar items in EconPapers)
Date: 2024
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/2673-4060/5/4/66/pdf (application/pdf)
https://www.mdpi.com/2673-4060/5/4/66/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jworld:v:5:y:2024:i:4:p:66-1306:d:1535742
Access Statistics for this article
World is currently edited by Ms. Cassie Hu
More articles in World from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().