Reservicing some customers in M / G / 1 queues under three disciplines
M. R. Salehi-Rad,
K. Mengersen and
G. H. Shahkar
International Journal of Mathematics and Mathematical Sciences, 2004, vol. 2004, 1-9
Abstract:
Consider an M / G / 1 production line in which a production item is failed with some probability and is then repaired. We consider three repair disciplines depending on whether the failed item is repaired immediately or first stockpiled and repaired after all customers in the main queue are served or the stockpile reaches a specified threshold. For each discipline, we find the probability generating function (p.g.f.) of the steady-state size of the system at the moment of departure of the customer in the main queue, the mean busy period, and the probability of the idle period.
Date: 2004
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/IJMMS/2004/654739.pdf (application/pdf)
http://downloads.hindawi.com/journals/IJMMS/2004/654739.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jijmms:654739
DOI: 10.1155/S0161171204210389
Access Statistics for this article
More articles in International Journal of Mathematics and Mathematical Sciences from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().