A Study on the Enhanced Best Performance Algorithm for the Just-in-Time Scheduling Problem
Sivashan Chetty and
Aderemi O. Adewumi
Discrete Dynamics in Nature and Society, 2015, vol. 2015, 1-12
Abstract:
The Just-In-Time (JIT) scheduling problem is an important subject of study. It essentially constitutes the problem of scheduling critical business resources in an attempt to optimize given business objectives. This problem is NP-Hard in nature, hence requiring efficient solution techniques. To solve the JIT scheduling problem presented in this study, a new local search metaheuristic algorithm, namely, the enhanced Best Performance Algorithm (eBPA), is introduced. This is part of the initial study of the algorithm for scheduling problems. The current problem setting is the allocation of a large number of jobs required to be scheduled on multiple and identical machines which run in parallel. The due date of a job is characterized by a window frame of time, rather than a specific point in time. The performance of the eBPA is compared against Tabu Search (TS) and Simulated Annealing (SA). SA and TS are well-known local search metaheuristic algorithms. The results show the potential of the eBPA as a metaheuristic algorithm.
Date: 2015
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/DDNS/2015/350308.pdf (application/pdf)
http://downloads.hindawi.com/journals/DDNS/2015/350308.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnddns:350308
DOI: 10.1155/2015/350308
Access Statistics for this article
More articles in Discrete Dynamics in Nature and Society from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().