A Metaheuristic Method for the Task Assignment Problem in Continuous-Casting Production
Hongtao Hu,
Yiwei Wu and
Tingsong Wang
Discrete Dynamics in Nature and Society, 2018, vol. 2018, 1-12
Abstract:
The steelmaking and continuous-casting (SCC) process in integrated iron and steel enterprises can be described as two stages: the upstream stage and downstream stage. Raw materials are transformed into molten steel in the upstream stage, while the downstream stage is responsible for transforming molten steel which is released at regular intervals and has a limited time for being turned into slabs. This article focuses on the task assignment problem in the downstream stage within the given information resulting from the upstream stage. This problem is formulated as a nonlinear mixed-integer programming model aimed at minimizing total tardiness within the resource constraints and time windows constraints for the tasks. An improved solution algorithm based on particle swam optimization is developed to efficiently solve the proposed model. Finally, computational experiments are implemented to evaluate the performance of the solution algorithm in terms of solution quality and computational time.
Date: 2018
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/DDNS/2018/8073648.pdf (application/pdf)
http://downloads.hindawi.com/journals/DDNS/2018/8073648.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnddns:8073648
DOI: 10.1155/2018/8073648
Access Statistics for this article
More articles in Discrete Dynamics in Nature and Society from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().