EconPapers    
Economics at your fingertips  
 

Mean time for the development of large workloads and large queue lengths in the G I / G / 1 queue

Charles Knessl and Charles Tier

International Journal of Stochastic Analysis, 1996, vol. 9, 1-36

Abstract:

We consider the G I / G / 1 queue described by either the workload U ( t ) (unfinished work) or the number of customers N ( t ) in the system. We compute the mean time until U ( t ) reaches excess of the level K , and also the mean time until N ( t ) reaches N 0 . For the M / G / 1 and G I / M / 1 models, we obtain exact contour integral representations for these mean first passage times. We then compute the mean times asymptotically, as K and N 0 → ∞ , by evaluating these contour integrals. For the general G I / G / 1 model, we obtain asymptotic results by a singular perturbation analysis of the appropriate backward Kolmogorov equation(s). Numerical comparisons show that the asymptotic formulas are very accurate even for moderate values of K and N 0 .

Date: 1996
References: Add references at CitEc
Citations:

Downloads: (external link)
http://downloads.hindawi.com/journals/IJSA/9/515492.pdf (application/pdf)
http://downloads.hindawi.com/journals/IJSA/9/515492.xml (text/xml)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hin:jnijsa:515492

DOI: 10.1155/S1048953396000147

Access Statistics for this article

More articles in International Journal of Stochastic Analysis from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().

 
Page updated 2025-03-19
Handle: RePEc:hin:jnijsa:515492