EconPapers    
Economics at your fingertips  
 

Modeling of Multitask Principal-Agent Based on Accounts Receivable

Yuhong Xin, Dehui Liu, Xiaoli Li and Stefania Tomasiello

Mathematical Problems in Engineering, 2022, vol. 2022, 1-10

Abstract: The research work on multi-task principal-agent in supply chain seldom considered other factors. In this paper, basing on accounts receivable mode of supply chain finance, we add the financing factor of bank in multi-task principal-agent to study the incentive mechanism between the manufacturer and the supplier. First we develop an incentive model under the condition of symmetric information and work out the optimal result. Next the circumstance with asymmetric information is also discussed. Last, the effort level of supplier is discussed when the receivables business ran normally.

Date: 2022
References: Add references at CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://downloads.hindawi.com/journals/mpe/2022/1506150.pdf (application/pdf)
http://downloads.hindawi.com/journals/mpe/2022/1506150.xml (application/xml)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:1506150

DOI: 10.1155/2022/1506150

Access Statistics for this article

More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().

 
Page updated 2025-03-19
Handle: RePEc:hin:jnlmpe:1506150