Scheduling Jobs with Maintenance Subject to Load-Dependent Duration on a Single Machine
Yawei Qi,
Long Wan and
Zhigang Yan
Mathematical Problems in Engineering, 2015, vol. 2015, 1-6
Abstract:
This paper investigates a scheduling problem on a single machine with maintenance, in which the starting time of the maintenance is given in advance but its duration depends on the load of the machine before the maintenance. The goal is to minimize the makespan. We formulate it as an integer programming model and show that it is NP-hard in the ordinary sense. Then, we propose an FPTAS and point out that a special case is polynomial solvable. Finally, we design fast heuristic algorithms to solve the scheduling problem. Numerical experiments are implemented to evaluate the performance of the proposed heuristic algorithms. The results show the proposed heuristic algorithms are effective.
Date: 2015
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2015/198950.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2015/198950.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:198950
DOI: 10.1155/2015/198950
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().