Real-Time Track Reallocation for Emergency Incidents at Large Railway Stations
Wei Liu,
Xiaoning Zhu and
Liujiang Kang
Mathematical Problems in Engineering, 2015, vol. 2015, 1-11
Abstract:
After track capacity breakdowns at a railway station, train dispatchers need to generate appropriate track reallocation plans to recover the impacted train schedule and minimize the expected total train delay time under stochastic scenarios. This paper focuses on the real-time track reallocation problem when tracks break down at large railway stations. To represent these cases, virtual trains are introduced and activated to occupy the accident tracks. A mathematical programming model is developed, which aims at minimizing the total occupation time of station bottleneck sections to avoid train delays. In addition, a hybrid algorithm between the genetic algorithm and the simulated annealing algorithm is designed. The case study from the Baoji railway station in China verifies the efficiency of the proposed model and the algorithm. Numerical results indicate that, during a daily and shift transport plan from 8:00 to 8:30, if five tracks break down simultaneously, this will disturb train schedules (result in train arrival and departure delays).
Date: 2015
References: Add references at CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2015/296394.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2015/296394.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:296394
DOI: 10.1155/2015/296394
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().