Multiple Precast Component Orders Acceptance and Scheduling

Wen Jiang, Lanjun Wu and Yunzhong Cao

Mathematical Problems in Engineering, 2020, vol. 2020, 1-15

Abstract:

Precast components manufacturer generally operates under limited production capacity and produces products of one order which may delay another. This paper develops a precast component order acceptance and scheduling model that aims to maximize the total profit in a stochastic multiple orders environment. In that model, the increasing of the overall profit of the precast component manufacturer is achieved by using a heuristic algorithm and a dynamic order acceptance heuristic. Results of numerical examples indicate the proposed model realizes the increasing total profit in most cases comparing to accept all of the orders. Besides, this study tested three order acceptance criteria and found that the profit-based criterion is to be more stable in terms of maximum total profit. This approach is anticipated to provide support to precast component manufacturers when faced with multiple orders in long-term production.

Date: 2020
References: Add references at CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2020/3849561.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2020/3849561.xml (text/xml)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:3849561

DOI: 10.1155/2020/3849561

Access Statistics for this article

More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().

 
Page updated 2025-03-19
Handle: RePEc:hin:jnlmpe:3849561