EconPapers    
Economics at your fingertips  
 

Imperfect Reworking Process Consideration in Integrated Inventory Model under Permissible Delay in Payments

Ming-Cheng Lo and Ming-Feng Yang

Mathematical Problems in Engineering, 2008, vol. 2008, 1-18

Abstract:

This study develops an improved inventory model to help the enterprises to advance their profit increasing and cost reduction in a single vendor single-buyer environment with general demand curve, adjustable production rate, and imperfect reworking process under permissible delay in payments. For advancing practical use in a real world, we are concerned with the following strategy determining, which includes the buyer's optimal selling price, order quantity, and the number of shipments per production run from the vendor to the buyer. An algorithm and numerical analysis are used to illustrate the solution procedure.

Date: 2008
References: Add references at CitEc
Citations:

Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2008/386252.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2008/386252.xml (text/xml)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:386252

DOI: 10.1155/2008/386252

Access Statistics for this article

More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().

 
Page updated 2025-03-19
Handle: RePEc:hin:jnlmpe:386252